Logo video2dn
  • Сохранить видео с ютуба
  • Категории
    • Музыка
    • Кино и Анимация
    • Автомобили
    • Животные
    • Спорт
    • Путешествия
    • Игры
    • Люди и Блоги
    • Юмор
    • Развлечения
    • Новости и Политика
    • Howto и Стиль
    • Diy своими руками
    • Образование
    • Наука и Технологии
    • Некоммерческие Организации
  • О сайте

Скачать или смотреть 2022-08 - Self Closing Flood Barrier (SCFB)

  • Eddy Lau
  • 2022-02-02
  • 4427
2022-08 - Self Closing Flood Barrier (SCFB)
CFDFlow 3DSelf Closing Flood BarrierSCFBFlood Protection
  • ok logo

Скачать 2022-08 - Self Closing Flood Barrier (SCFB) бесплатно в качестве 4к (2к / 1080p)

У нас вы можете скачать бесплатно 2022-08 - Self Closing Flood Barrier (SCFB) или посмотреть видео с ютуба в максимальном доступном качестве.

Для скачивания выберите вариант из формы ниже:

  • Информация по загрузке:

Cкачать музыку 2022-08 - Self Closing Flood Barrier (SCFB) бесплатно в формате MP3:

Если иконки загрузки не отобразились, ПОЖАЛУЙСТА, НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если у вас возникли трудности с загрузкой, пожалуйста, свяжитесь с нами по контактам, указанным в нижней части страницы.
Спасибо за использование сервиса video2dn.com

Описание к видео 2022-08 - Self Closing Flood Barrier (SCFB)

Self closing flood barrier (SCFB) is simulated by Flow 3D to illustrate how this floating flood barrier can prevent overflow from stream course.

I have heard of this self closing flood barrier about 4 years ago when working on a drainage improvement project in Hong Kong. I like its design to float up light-weight wall panel by water for flood protection without any mechanical and electrical parts. It was regrettable that maintenance agent of drainage authority preferred to use concrete flood wall instead due to its easy maintenance.

In this simulation, water level rises up 2m very quickly in 10s and the use of a 100mm dia pipe to lift up flood barrier appears appropriate. In real life, water level rises up much slower, may be in an hour or longer depending size of the drainage basin. A service pit can be installed between the stream course and flood barrier with a water intake opening at higher level. This could prevent the flood barrier to float up too early.

Комментарии

Информация по комментариям в разработке

Похожие видео

  • О нас
  • Контакты
  • Отказ от ответственности - Disclaimer
  • Условия использования сайта - TOS
  • Политика конфиденциальности

video2dn Copyright © 2023 - 2025

Контакты для правообладателей [email protected]