Work begins on demolition of westbound Washington Bridge

Описание к видео Work begins on demolition of westbound Washington Bridge

The Rhode Island Department of Transportation says crews have started stripping asphalt off the westbound Washington Bridge, which was abruptly closed in December.

RIDOT said the process of removing the asphalt will take about two weeks, if the weather cooperates.

The bridge is slated to be demolished by March.

Sky 10 flew over the work scene.

https://turnto10.com/news/washington-...

#washingtonbridge #providence #rhodeisland #traffic

-----

NBC 10 WJAR is Southern New England's leading news station, covering news, politics, sports and weather in Rhode Island, Southeastern Massachusetts and Eastern Connecticut, including Providence, Central Falls, Cranston, East Providence, Newport, Pawtucket, Warwick, Woonsocket, Attleboro, Fall River, New Bedford, Taunton and Cape Cod, and surrounding communities.

Our homepage is https://turnto10.com
Like us on Facebook at   / nbc10  
Follow us on X at https://x.com/nbc10
Follow us on Instagram at   / nbc10wjar  

Download the NBC 10 News app for iOS at
https://apps.apple.com/us/app/nbc-10-...

Download the NBC 10 News app for Android at
https://play.google.com/store/apps/de...

Report news to NBC 10 at 401-455-9105 or email [email protected]

Share your images and video with NBC 10 at https://turnto10.com/chimein

Комментарии

Информация по комментариям в разработке