Скачать или смотреть Padma Bridge পদ্মা সেতুর ৩৪ এবং ৩৫ নম্বর পিলার. (04-08-2016).Padma Bridge Bangladesh Construction

  • View Bangladesh
  • 2016-08-04
  • 40193
Padma Bridge পদ্মা  সেতুর ৩৪ এবং ৩৫ নম্বর  পিলার. (04-08-2016).Padma Bridge Bangladesh Construction
bridgepadma bridgepadma bridge bangladeshpadma shetu bangladeshpadma bridge in bangladesh 2016importance of padma bridge in bangladeshpadma bridge in bangladesh latest newspadma bridge projectpadmapadma bridge in bangladeshthe padmaPadma Bridge latest newsPadma Bridge SongPadma Bridge ProgressBangladesh BridgeLong BridgeBangladeshpadma bridge project focusView Bangladesh
  • ok logo

Скачать Padma Bridge পদ্মা সেতুর ৩৪ এবং ৩৫ নম্বর পিলার. (04-08-2016).Padma Bridge Bangladesh Construction бесплатно в качестве 4к (2к / 1080p)

У нас вы можете скачать бесплатно Padma Bridge পদ্মা সেতুর ৩৪ এবং ৩৫ নম্বর পিলার. (04-08-2016).Padma Bridge Bangladesh Construction или посмотреть видео с ютуба в максимальном доступном качестве.

Для скачивания выберите вариант из формы ниже:

  • Информация по загрузке:

Cкачать музыку Padma Bridge পদ্মা সেতুর ৩৪ এবং ৩৫ নম্বর পিলার. (04-08-2016).Padma Bridge Bangladesh Construction бесплатно в формате MP3:

Если иконки загрузки не отобразились, ПОЖАЛУЙСТА, НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если у вас возникли трудности с загрузкой, пожалуйста, свяжитесь с нами по контактам, указанным в нижней части страницы.
Спасибо за использование сервиса video2dn.com

Описание к видео Padma Bridge পদ্মা সেতুর ৩৪ এবং ৩৫ নম্বর পিলার. (04-08-2016).Padma Bridge Bangladesh Construction

Many people dream of the bridge. Bridge do not want the company is working. The work is being funded. Work is progressing rapidly. The bridge is much bigger role in the economy is to come. There is currently under construction. Padma Multipurpose Bridge Project
Overview of Padma Multipurpose Bridge Project
General Information
Pr-feasibility Study – 1998-1999 – GoB Fund

» Pr-feasibility Study – 1998-1999 – GoB Fund
» Feasibility Study – 2003-2005 – JICA Grant
» Feasibility Study – 2003-2005 – JICA Grant
» LAP, RAP & EMP – 2006 – GoB Fund
» Detailed Design and procurement – 2009-2011 – ADB TA Loan
» Procurement & Implementation – 2011-2015 – GoB
» Estimated Project Cost (as per Final Design:
BDT 205072 Million or,
USD 2.972 Billion (Including VAT and IT)
» Land Acquisition : About 1100 hector
» Bridge in Brief
Main Bridge Length : 6.15 km
Viaduct : 3.148 km (Road), 532 m (Rail)
Approach Road : 12 km
River Training Works : 14 km (1.6 Mawa + 12.4 in Janjira)
Work Component Amount in Million (BDT & USD)
Work Component Total BDT USD 5852.74 1126.93 83610.62 1211.75 888.84 171.14 12697.66 184.02 8775.42 508.72 43877.10 635.90 2000.00 177.31 14234.70 206.30 9444.20 – 9444.20 136.87 – 18.70 1290.30 18.70 51.84 88.00 6123.84 88.75 15563.74 264.20 33793.60 489.76 Total 42576.78 2355.00 205072.02 2972.06

Sl. No.
GOB PA
BDT USD
1. Main Bridge
2. Approach Roads and Toll Plasa-12 km
3. River Training Works
4. Resettlement
5. Land Acquisition (1124.77 ha)
6. Environment
7. Consultancy
8. Others (Salary, Transport, CD VAT and Tax, physical and price Contingency, Interest etc.)
Funding Arrangement
Preset Status of the Project
Main Bridge Details
Main Bridge Details

Span Total 41nos.
2 transition pier at landward ends and
40 Center pier
Span Length 150 m eachComposite Superstructure (Warren type Steel Truss Girder and Concrete on Upper Deck)
Total Lengh (Main Bridge) 41*150=6150 m = 6.150 km.Total 7 Nos Module:
6 span in each 6 module
5 span in one module
Pile Details
Racked (Inclined at 1H:6V) Steel Tubular driven pile
6 Nos. In each pier
Pile Diameter = 3m
Pile Length = 117m (near bank)
Pile Length = 101m (Centre)
Total number of pile in Main Bridge:
Steel Pile = 40*6 = 240 nos
vertical bored concrete pile = 2*12 = 24 nos (upto 80m depth)
Upper Deck
22 m wide concrete deck slab (2.5 m hard shoulder on the both side)
4 Lane road
Lower Deck Single Track Dual Gauge Rail
Deck Height 13.6 m
Navigational Clearance 18.30 m
Viaduct Mawa End (North Bank 19+20 = 39 Span; Length = 1478.03m
Janjira 23+19 = 42 Span; Length = 1670.03m
Total Road Viaduct (81 Span) = 3148.603m
Rail Viaduct 7+7 = 14 Span; Length = 532m
Utilities Through the Bridge
760mm dia Gas Transmission Line
150mm dia Fiber optical & Telephone Duct
7 nos High voltage Electric Line Platform in River over Pile Foundation
Road and Bridge End Facility [/expand]
34 and 35 the number of Padma bridge pillar
View Bangladesh

Комментарии

Информация по комментариям в разработке

Похожие видео

  • О нас
  • Контакты
  • Отказ от ответственности - Disclaimer
  • Условия использования сайта - TOS
  • Политика конфиденциальности

video2dn Copyright © 2023 - 2025

Контакты для правообладателей [email protected]