Mirage: Main Pilot Chute Installation

Описание к видео Mirage: Main Pilot Chute Installation

The Mirage Main Pilot Chute is installed by inserting the kill-line, retention strap and bridle from the outside of the D-bag into the inside of the D-bag through the center grommet. Secure the two loops of the bridle inside the D-bag with a metal link or soft link.

For Complete ChutingStar Expert Advice Article: http://csne.ws/179aGjF

Комментарии

Информация по комментариям в разработке