New Austrian Tunnel Method (NATM) First Round

Описание к видео New Austrian Tunnel Method (NATM) First Round

This method of development involves drilling sacrificial tubular drill steel and pressure grouting a canopy of grout to hold back fine sands, river bed/coble. Here 3 way articulating excavator is clawing away a layer of rock before the full river bed is reached.

Комментарии

Информация по комментариям в разработке