Cable crane system for the construction of Limberg II

Описание к видео Cable crane system for the construction of Limberg II

A LCS cable crane system was used for the construction of the hydro power plant Limberg II. The system transported construction material and personnel to the site at 2.000 m above sea level.

Комментарии

Информация по комментариям в разработке