B Furnace Reline 1997 - Rouge Steel

Описание к видео B Furnace Reline 1997 - Rouge Steel

This video was taken by me while working for Rouge Steel (the old Ford Steel Division) located at the Ford Rouge Complex in Dearborn, MI. I was a project engineer assigned to the rebuild team. The rebuild took about 3 months, if I remember. The video follows the process from the initial attempt to 'bottom tap' (drain out all the remaining liquid iron) the blast furnace, stripping out the old refractory and cooling piping, repairing the main shell, completely rebuilding the entire furnace, drying out the new refractory and finally loading it with burden (iron ore, scrap steel, limestone, and coke).