Logo video2dn
  • Сохранить видео с ютуба
  • Категории
    • Музыка
    • Кино и Анимация
    • Автомобили
    • Животные
    • Спорт
    • Путешествия
    • Игры
    • Люди и Блоги
    • Юмор
    • Развлечения
    • Новости и Политика
    • Howto и Стиль
    • Diy своими руками
    • Образование
    • Наука и Технологии
    • Некоммерческие Организации
  • О сайте

Скачать или смотреть Lach Huyen Port | Outer Revetment & Sand Protection Dike | Nov 2018

  • PORTCOAST CONSULTANT
  • 2018-12-02
  • 3251
Lach Huyen Port | Outer Revetment & Sand Protection Dike | Nov 2018
port consultantport engineeringmaritimeconstructioninspectionOuter revetmentsand protection dikeLach HuyenLach Huyen PortHai Phongsupervisorconstruction supervisorTân Vũ Lạch HuyệnLạch Huyện CảngCảng quốc tếInternational port
  • ok logo

Скачать Lach Huyen Port | Outer Revetment & Sand Protection Dike | Nov 2018 бесплатно в качестве 4к (2к / 1080p)

У нас вы можете скачать бесплатно Lach Huyen Port | Outer Revetment & Sand Protection Dike | Nov 2018 или посмотреть видео с ютуба в максимальном доступном качестве.

Для скачивания выберите вариант из формы ниже:

  • Информация по загрузке:

Cкачать музыку Lach Huyen Port | Outer Revetment & Sand Protection Dike | Nov 2018 бесплатно в формате MP3:

Если иконки загрузки не отобразились, ПОЖАЛУЙСТА, НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если у вас возникли трудности с загрузкой, пожалуйста, свяжитесь с нами по контактам, указанным в нижней части страницы.
Спасибо за использование сервиса video2dn.com

Описание к видео Lach Huyen Port | Outer Revetment & Sand Protection Dike | Nov 2018

Lach Huyen Port Infrastructure Construction Project Japanese ODA loans (Component A)

The Port will be developed in two phases, and will be equipped with comprehensive infrastructure and handling technology. It will be able to accommodate container ships between 4,000TEU and 6,000TEU, with the potential to accomodate 8,000TEU ships after expansion.The port is being constructed south of Lach Huyen's river estuary on Cat Hai Island. It will have a berth of approximately 8,000m, a route length of 18km. Two components, A and B. Component A is being managed by the Vietnam Ministry of Transport (MOT), The works will include construction of a one-lane access channel, anchorages, a 3,230m-long breakwater, a turning basin, a 7,600m-long sand control dyke, an internal road system, soft-soil ground improvement, temporary berths, roads in the administration area, and an administration office building.

Our Services:
2010-2015: Feasibility Study Review, Updated Feasibility Study Review, Detailed Design Review - Client: Vinamarine
2011: Soil investigation, Hydrological Survey for the Detailed Design - Client: Jica Study Team (Presented by Oriental Consultants Co. Ltd.,)
2013-2018: Construction Supervision (JV comprising Nippon Koei, JPC, Portcoast and NK Vietnam) - Client: Vietnam MOT.

▷ Link website: https://www.portcoast.com.vn/projects...


#portcoast #portconsultant #lachhuyen

Комментарии

Информация по комментариям в разработке

Похожие видео

  • О нас
  • Контакты
  • Отказ от ответственности - Disclaimer
  • Условия использования сайта - TOS
  • Политика конфиденциальности

video2dn Copyright © 2023 - 2025

Контакты для правообладателей [email protected]