M1101 Top Frame Build and Slide Out installed.

Описание к видео M1101 Top Frame Build and Slide Out installed.

Finally got around to making the frame and getting the first couple of items installed.
Affiliate links below for items I used.

Battery cut off - https://amzn.to/491Z7xq
Sink - https://amzn.to/49aGSpD
Water Tank - https://amzn.to/43x6QSR
110 v Pass through - https://amzn.to/3x7S5dc
Weather stripping with seal - https://amzn.to/3vvLHfh
Weather stripping without seal - https://amzn.to/3TuL2Tp
Tie Downs - https://amzn.to/3ILfROV
Water Fill - https://amzn.to/3Py2XYk
Hinge - https://amzn.to/3Vr1PcN
LED Lights - https://amzn.to/3PyMN0W
Hose - https://amzn.to/4arZr9I
90 Hose attachment - https://amzn.to/3IOaUEP
5/8 to 1/2 90 - https://amzn.to/3VwzMbY
T fitting, 1/2 - https://amzn.to/3PBxd4C
Water vent - https://amzn.to/4ao3cNn
5/8 hose - https://amzn.to/3vg2GT0

Комментарии

Информация по комментариям в разработке