Pasig River Esplanade Phase 1C Almost Finished na!

Описание к видео Pasig River Esplanade Phase 1C Almost Finished na!

Pasig River Esplanade Phase 1C Update

The Pasig River Esplanade Phase 1C was inaugurated .This project is a part of the Pasig River Urban Development Showcase Area at Plaza Mexico, Magallanes Drive in Intramuros,the 25-kilometer development project, which is part of the ongoing “Pasig Bigyang Buhay Muli” project.

Phase 1C introduced a one-story structure with a roof deck along the Pasig River, featuring a three-meter wide walkway flanked by leasable commercial spaces at the ground level and a combination of a walkway, bike lane and viewing area on the roof deck.

It will encompass over 30 commercial stalls equipped with modern amenities, including sewage treatment, individual electric and water meters, fire protection and public restrooms.

The structures will use renewable energy and promote other ecological practices aligned with the environmental protection and conservation strategies of the government.


The additional 250-meter development connecting the existing esplanade from Jones Bridge to Plaza Mexico and Fort Santiago marks the completion of the 500-meter showcase area of the Manila Old Downtown Segment.

the ongoing “Pasig Bigyang Buhay Muli” project, the newly inaugurated Phase 1C features pedestrian-friendly infrastructure, commercial zones, and green spaces that are expected to drive local economy and tourism through food and retail stalls, walkways, bike lanes, and boardwalk.

Комментарии

Информация по комментариям в разработке