Steel Bridge opening for Fleet Week 2019

Описание к видео Steel Bridge opening for Fleet Week 2019

Kiddo and I got to watch the Steel Bridge raise up to hits full height during Fleet Week 2019 in Portland. A double-action Vertical-Lift bridge that first retracts the Union Pacific section into the Highway section above.

Toward the end it's surprising to watch how the counterweight descends below the catenary lines that give power for the MAX Light Rail trains.

Комментарии

Информация по комментариям в разработке