ফার্মগেট থেকে কিভাবে এলিভেটেড এক্সপ্রেসওয়েতে যাবেন || Moving Bangladesh || ELEVATED EXPRESSWAY || 4K
#moving_bangladesh
• মাত্র ১০ মিনটে এয়ারপোর্ট থেকে ফার্মগে...
• এই ভুল কেউ করবেন না || বিমানবন্দর ৩য় ...
• আগারগাঁও আর আগের মতো নেই || দিন বদলে...
Dhaka Elevated Expressway is Bangladesh's first elevated expressway project,[1] which will connect the Shahjalal airport with Kutubkhali via Mohakhali, Tejgaon, and Kamalapur of Dhaka, Bangladesh.[2] It is one of the largest infrastructure projects taken up by the incumbent government to ease traffic congestion in the capital.[3] It will be 19.73 km (64,700 ft) long (46.73 km with the connecting ramps)[4] and will cost around ৳122 billion (US$1.1 billion).[2] On September 2, 2023, Prime Minister Sheikh Hasina ceremoniously opened the Airport-Farmgate section of the Dhaka Elevated Expressway, with her motorcade covering the toll of Tk 2,000 for 25 vehicles.[5] Prime Minister Sheikh Hasina inaugurated the 11.5 km Airport-Farmgate section of the 19.73 km Dhaka Elevated Expressway, a pioneering infrastructure project in Bangladesh. This development holds great promise for alleviating traffic congestion and shortening commuting times in the capital city. Commuters were thrilled to be able to cover the distance between Kawla and Farmgate in just 10 minutes, with speeds reaching up to 60 km per hour.
The Dhaka BRT (Bengali: ঢাকা বিআরটি, romanised: Dhaka Bi-Ar-Ti) or Dhaka Line Bengali: ঢাকা লাইন, romanised: Dhaka Lain) is a bus rapid transit system in Dhaka, Bangladesh. Of two routes that were originally planned, only one section of a line is under construction from 2017, with the other route being in the planning phase.
History
Planning
In 2005, the World Bank published a study report, recommending that the government of Bangladesh build a transit system in Dhaka. In the same year, American consultancy firm Louis Berger Group prepared a strategic transport plan for Dhaka.[1] The World Bank helped to develop this plan, which proposed the construction of a bus rapid transit system in Dhaka.[2][3] In 2011, a primary feasibility study was done for BRT by the Asian Development Bank.[4] In 1 December 2012, the ECNEC approved the Dhaka bus rapid transit project.[4] Two lines of bus rapid transit were proposed by the government for construction.[5] The budget of BRT Line 3 was fixed at ৳2,040 crores.
এখনও এলিভেটেড এক্সপ্রেসওয়ের প্রভাব পড়েনি যানজটে | Dhaka Elevated Expressway | Channel 24
ছয় জায়গা থেকে ওঠা যাবে এলিভেটেড এক্সপ্রেসওয়েতে | Dhaka Elevated Expressway | Ekhon TV
ঢাকা এলিভেটেড এক্সপ্রেসওয়েতে চললো বিআরটিসি বাস | Elevated Expressway | BRTC Bus | Jamuna TV
কাওলা-ফার্মগেট ১১.৫ কিলোমিটার ভ্রমণ | Dhaka Elevated Expressway | Drone View | BRT | Ekhon TV
Best Bus Journey। মাত্র ৪০ টাকায় Dhaka Airport - Elevated Express Way।Bus travel Dhaka Bangladesh
বিআরটিসি বাসে ২০ মিনিটেই ফার্মগেট থেকে উত্তরা | BRTC Bus | Elevated Expressway | Somoy TV
elevated expressway,
elevated expressway dhaka update,
elevated expressway dhaka map,
elevated expressway chittagong,
elevated expressway dhaka farmgate,
elevated expressway dhaka opening,
elevated expressway dhaka 3d,
elevated expressway update,
elevated expressway airport,
elevated expressway animation,
elevated expressway airport to farmgate,
elevated expressway at night
Информация по комментариям в разработке