LEO TakeDown V2 install Complete with new install tips

Описание к видео LEO TakeDown V2 install Complete with new install tips

Installing the LEO TakeDown on a mil-spec upper receiver, with new components. Complete install - includes installing gas tube, muzzle device, and Mission First Tactical Tekko free float rail (Barrel, gas components, muzzle device, and rail, not included in basic kit).

http://www.leotakedown.com

Комментарии

Информация по комментариям в разработке