Logo video2dn
  • Сохранить видео с ютуба
  • Категории
    • Музыка
    • Кино и Анимация
    • Автомобили
    • Животные
    • Спорт
    • Путешествия
    • Игры
    • Люди и Блоги
    • Юмор
    • Развлечения
    • Новости и Политика
    • Howto и Стиль
    • Diy своими руками
    • Образование
    • Наука и Технологии
    • Некоммерческие Организации
  • О сайте

Скачать или смотреть 🏗️ Rooftop Units Installed – Major HVAC Upgrade Complete! 🚛❄️ | EP-148

  • TheRilwan
  • 2026-02-22
  • 3
🏗️ Rooftop Units Installed – Major HVAC Upgrade Complete! 🚛❄️ | EP-148
Roof penetration for rooftop unitsRTU structural reinforcementCrane liftFlatbed truck deliveryWinter construction conditionsChicago winter is no jokeWinter constructionRooftop unit installationCrane lifting HVAC unitsCommercial roof workRTU placement
  • ok logo

Скачать 🏗️ Rooftop Units Installed – Major HVAC Upgrade Complete! 🚛❄️ | EP-148 бесплатно в качестве 4к (2к / 1080p)

У нас вы можете скачать бесплатно 🏗️ Rooftop Units Installed – Major HVAC Upgrade Complete! 🚛❄️ | EP-148 или посмотреть видео с ютуба в максимальном доступном качестве.

Для скачивания выберите вариант из формы ниже:

  • Информация по загрузке:

Cкачать музыку 🏗️ Rooftop Units Installed – Major HVAC Upgrade Complete! 🚛❄️ | EP-148 бесплатно в формате MP3:

Если иконки загрузки не отобразились, ПОЖАЛУЙСТА, НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если у вас возникли трудности с загрузкой, пожалуйста, свяжитесь с нами по контактам, указанным в нижней части страницы.
Спасибо за использование сервиса video2dn.com

Описание к видео 🏗️ Rooftop Units Installed – Major HVAC Upgrade Complete! 🚛❄️ | EP-148

🏗️ Rooftop Units Installed – Major HVAC Upgrade Complete! 🚛❄️

Today is a BIG milestone for this project! The crane arrived, the flatbed truck delivered the units, and we successfully lifted and set the new rooftop units (RTUs) on top of the building.

In this episode, you’ll see:

✅ Crane lifting rooftop HVAC units onto the new roof
✅ Winter rooftop installation in freezing temperatures
✅ Mechanical engineer verifying correct unit tonnage
✅ Proper placement of supply and return connections
✅ Coordinating contractors during live installation

Each rooftop unit has a specific tonnage requirement based on the space it serves, so placement and verification are critical. The crane carefully hoisted each unit while the team guided it into position. From reinforcement to final placement, this was a coordinated effort.

It was cold — about 32 degrees but feeling like 20 — but progress doesn’t stop. This upgrade moves us one step closer to completing the building’s heating and cooling system.

This is real-time commercial renovation — the ups, the downs, the coordination, and the execution.

If you enjoy watching real estate development, construction progress, HVAC installation, and behind-the-scenes project management, this one is for you.

👍 Like the video
💬 Drop a comment
🔔 Subscribe to follow the full renovation journey

Progress is being made. One lift at a time.

Your support helps the channel grow and keeps these real-world projects coming.

Follow me on my other Social Media Accounts:
📸 Instagram:   / therilwon  

📘 Facebook: https://www.facebook.com/profile.php?...

🎵 TikTok:   / therilwan  

Комментарии

Информация по комментариям в разработке

Похожие видео

  • О нас
  • Контакты
  • Отказ от ответственности - Disclaimer
  • Условия использования сайта - TOS
  • Политика конфиденциальности

video2dn Copyright © 2023 - 2025

Контакты для правообладателей [email protected]