ALE 25th February 2018

Описание к видео ALE 25th February 2018

ALE transport a Siemens 200 tonne gas turbine from Goole West dock to Ferrybridge power station. 2 Trojan tractors and 20 row girder frame trailer. The load was height critical and at several locations en route stops were required to adjust the trailer running height.

Комментарии

Информация по комментариям в разработке