Amtrak P-811 MOW Track Laying System Crew Placing Concrete Ties

Описание к видео Amtrak P-811 MOW Track Laying System Crew Placing Concrete Ties

See how it's done up close as an Amtrak work crew uses the P-811 Track Laying System to lift the new track, push the aggregate aside, pull the old wooden ties and place new concrete ties and clip the rail in place all at once with this amazing machinery.
****Watch my videos of the TLM (Track Laying Machine) crew:    • Amtrak P-811 MOW Track Laying System ...  
**   • Gettin It Done: A Look at Amtrak P-81...  **
*   • Amazing Machines: A Look at Amtrak P-...  *
*Watch my video of the Amtrak Undercutter at work:   • Gettin It Done: A Look at Amtrak Unde...  **
**Watch my video of Amtrak locomotives No. 726, an EMD GP38-3 and No. 525, an EMD GP38H-3, with a work train full of concrete ties:    • Amtrak Train GP38-3 No. 726 and GP38H...  **
**Watch my video of a work crew with a tie crane and a tie remover/inserter working on the track:    • Amtrak MOW Work Crew Checking Clips o...   **
*Watch my video of the concrete tie clip fasteners being aligned by an Amtrak MOW work crew:    • Amtrak MOW Work Crew Checking Clip Fa...  **
**Watch my video as Brandt R4 Power Unit Hi Rail Truck pulls an Amtrak LORAM ballast train to a stop and blows a warning horn for an approaching Amtrak train:    • Amtrak LORAM Work Train Crew Blows Ho...  **

View my videos of the Amtrak locomotives at the front end of this MOW train:
   • Amtrak Train GP38-3 No. 726 and GP38H...  
   • Amtrak LORAM Work Train Crew Blows Ho...  

View my Amtrak Train Playlist:
   • Amtrak Trains  

View my full train playlist with dozens of videos on my channel:
   • Trains  

(Video by Dan’s Cool Videos)
Thanks for watching. If you liked this video, make sure to subscribe for more!

Комментарии

Информация по комментариям в разработке