Capacity Planning Excel Format (In Hindi) || How to calculate Utized and Spare Capacity

Описание к видео Capacity Planning Excel Format (In Hindi) || How to calculate Utized and Spare Capacity

कैपेसिटी प्लानिंग Excel Sheet Format | अतिरिक्त और उपयोग की गई क्षमता की गणना कैसे करें
कैपेसिटी प्लानिंग के क्या लाभ हैं |
What is Capacity Planning,
How to Calculate Spare & utilized Capacity,
What are the Benefits of Capacity Planning,
Capacity + RM Planning Excel Format,

CNC & Machine Shop Automated Capacity Planning, RM Planning with Product & Cycle Time Master (Click Here to Download) : https://tinyurl.com/5n73y2a5


Subscribe Now,, Our Computer Training Channel :    / @aytcomputer  

AYT India Academy Training App has been launched,
Download Link (AYT इंडिया अकैडमी एप्प अभी डाउनलोड करे) https://clphaward.page.link/VToQ
Special Note - I phone users Use Org Code : BZXQJ

AYT Online Training Website : https://learn.aytindia.com
--------------
आप इन लिंक पर क्लिक कर के ऑन लाइन ट्रेनिंग कोर्स के लिए अभी रजिस्टर कर सकते है
DPR with OEE Downloadable Formats : https://tinyurl.com/a5ne3uky
Maintenance Systems (12 Formats) Online Training Course : http://tinyurl.com/3y8rrt6y
Store Keeper Online Training Course : http://tinyurl.com/45w5ujup
AYT Enquiry Form : http://tinyurl.com/3zhk66cp
________
5S, KAIZEN, LEAN, TPM, VSM, DWM, TIMWOOD, PQCDSME, STORE MANAGEMENT, MAINTENANCE, QUALITY, BTECH,HR TRAINING
------
Visit Our Website @ https://www.aytindia.com
AYT India Academy YT @    / aytindiaacademy  
AYT India FB Group @   / aytindia  
AYT India FB Page @   / aytindiaacademy  
Linkedin @   / shakir-mohd-483a75103  
_____________________________________________________________________
Channel Videos:
What is TPM & TPM 8 Pillars :    • What is TPM & TPM 8 Pillars |TPM -Tot...  
7 Quality Control Tools :    • 7 Quality Control Tools | 7 QC TOOLS ...  
What is KAIZEN CONCEPT of LEAN :    • What is KAIZEN CONCEPT of LEAN: Conti...  
Lean Manufacturing सिर्फ 15 मिनट में सीखें (हिंदी) :    • Lean Manufacturing सिर्फ 15 मिनट में ...  
What is O.E.E (Overall Equipment Effectiveness):    • What is O.E.E (Overall Equipment Effe...  
____________________________________________________________________
Channel Playlists:
LEAN Manufacturing : https://tinyurl.com/y3ztccm8
Interview Tips :    • इंटरव्यू और रिज्यूमे में ये 5 गलतिया ...  
Quality & Systems : https://tinyurl.com/yx8ucoux
TPM (Total Productive Maintenance) : https://tinyurl.com/y3f3n8kw
Inventory & Store Management Series : https://tinyurl.com/y3gwrxus
---
About Myself: Shakir Mohd (Founder & CEO - AYT Business Solutions)

• I am a B.Tech in Mechanical Engineering
• I have total working Experience of Around 10 Years in Training, Execution and Implementations of Various Lean Tools and Techniques (such as VSM, KAIZEN, TPM, 5S, Visual Management, Poka-yoke, SMED etc.) in approx. 150 Units.
• I have a wide exposure for Implementation of Lean Manufacturing Tools & Techniques to different industries like Automobile, Engineering, Food Industries, Leather Handicrafts, Leather Garments, Garments, Printing, Packaging, Shoes Industries, Plastic Injection Moulding, Aluminum Die Casting, CNC Machining, Conventional Machining, Tool Room, Press Shop, Fan Industry, Bicycle Industry, Fabrication & Sheet Metal etc. for improving their Productivity, Reducing Manufacturing cost & Rejection, 5S Levels, Employees Trainings with proper resource utilization and Implementation of various Kaizens (Improvements).

Key Skills:
• Value Stream Mapping (VSM), TIMWOOD (Seven Wastages), PQCDSME (Seven Benefits) Productivity Improvement, Time & Motion Study,
• Google Sheets and G-Suits
• TPM (Total Productive Maintenance), FUGAI Tags, 8 Pillars of TPM , Elimination of Six Big Losses (SSSMCB) through TPM
• 5S, KAIZEN, 7 QC Tools, VA/NVA Activities, Root cause analysis, SMED, Safety Improvements, Visual Management, etc.
----
SOME OF MY ONSITE PROJECTs OF TRAINING & CONSULTANCY, COMPLETED/ UNDER-PROCESS ARE:

Ultratech Cement (4 Plants)- Truck Turn Around Time (TAT) Prject
Combit Shoes, Bahadurgarh (HR)- Plant Layout Setup Project
Printsmith (Infinity Advertising Pvt. Ltd.),Faridabad
MSME- Faridabad Engineering Cluster No.1 (9 Units)- LMCS Cluster
MSME- Faridabad Engineering Cluster No.2 (6 Units)- LMCS Cluster
MSME- Faridabad Engineering Cluster No.4 (7 Units)- LMCS Cluster
MSME- Yamuna Nagar Engineering & Fabrication Cluster (9 Units)- LMCS Cluster
MSME- Ludhiana Cycle Parts Cluster No.2 (7 Units)- LMCS Cluster
MSME- Manesar, Leather Handicraft Cluster No.1 (7 Units)- LMCS Cluster
MSME- Bahadurgarh Footwear Cluster (6 Units)- LMCS Cluster
MSME- GZB Food Cluster (9 Units)- LMCS Cluster
Raga Engineers- Core Pins Productivity Improvement Project, Faridabad (HR)
Raga Engineers- Crack Toyota Project, Faridabad (HR)
Technomech Industries, Faridabad (HR)
Woodpecker Systems, Faridabad
Falcon Vacuum Pumps, Faridabad
PMT Engineers, Faridabad
UD food Products Pvt. Ltd., Ghaziabad
GK Industries, Faridabad
& Many More

Комментарии

Информация по комментариям в разработке