Logo video2dn
  • Сохранить видео с ютуба
  • Категории
    • Музыка
    • Кино и Анимация
    • Автомобили
    • Животные
    • Спорт
    • Путешествия
    • Игры
    • Люди и Блоги
    • Юмор
    • Развлечения
    • Новости и Политика
    • Howto и Стиль
    • Diy своими руками
    • Образование
    • Наука и Технологии
    • Некоммерческие Организации
  • О сайте

Скачать или смотреть 24.11 Material Requirement Calculation (Yield, Scrap)

  • Asprova Official Global Channel
  • 2014-04-14
  • 3789
24.11 Material Requirement Calculation (Yield, Scrap)
AsprovaProduction Scheduler24 Scheduling Logic : 2 Beginners : e-Learning
  • ok logo

Скачать 24.11 Material Requirement Calculation (Yield, Scrap) бесплатно в качестве 4к (2к / 1080p)

У нас вы можете скачать бесплатно 24.11 Material Requirement Calculation (Yield, Scrap) или посмотреть видео с ютуба в максимальном доступном качестве.

Для скачивания выберите вариант из формы ниже:

  • Информация по загрузке:

Cкачать музыку 24.11 Material Requirement Calculation (Yield, Scrap) бесплатно в формате MP3:

Если иконки загрузки не отобразились, ПОЖАЛУЙСТА, НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если у вас возникли трудности с загрузкой, пожалуйста, свяжитесь с нами по контактам, указанным в нижней части страницы.
Спасибо за использование сервиса video2dn.com

Описание к видео 24.11 Material Requirement Calculation (Yield, Scrap)

We can take yield and scrap into account when calculating the material requirement.
Let's study how to calculate the requirement when taking yield and scrap into account.
We can specify the [Yield rate] and the [Scrap quantity] for the "Input instruction" and "Output instruction".
At the [Order table], order "1" requires to produce 9 items of "AX".
Order "1" has been assigned already.
By looking at the [Inventory graph] it is easy to see that 9 items of "A" are required.
Please set 0.9 as the [Yield rate] for the "output instruction" and press the [Reschedule] button.
As 9 items of "AX" will be supplied to the next process, 10 items of "AX" will be produced and 10 items of "A" will be used.
This is because the [Yield rate] is set as 0.9.
Then, please set 1 as the [Scrap quantity].
Please, press the [reschedule] button and confirm that the required quantity of "A" increased by 1 to 11.
This time, please set 1 as the [Scrap quantity] for the "Input instruction" and press the [Reschedule] button again.
The manufacturing quantity of "AX" remains 11 items but the required quantity of "A" was increased to 12 items.
If we set 0.8 as the [Yield rate] for the "Input instruction" and reschedule it, the required quantity of "A" will change to 15.
For calculating material requirement it is also possible to use expressions.
Please refer to this website for details.

Комментарии

Информация по комментариям в разработке

Похожие видео

  • О нас
  • Контакты
  • Отказ от ответственности - Disclaimer
  • Условия использования сайта - TOS
  • Политика конфиденциальности

video2dn Copyright © 2023 - 2025

Контакты для правообладателей [email protected]