Logo video2dn
  • Сохранить видео с ютуба
  • Категории
    • Музыка
    • Кино и Анимация
    • Автомобили
    • Животные
    • Спорт
    • Путешествия
    • Игры
    • Люди и Блоги
    • Юмор
    • Развлечения
    • Новости и Политика
    • Howto и Стиль
    • Diy своими руками
    • Образование
    • Наука и Технологии
    • Некоммерческие Организации
  • О сайте

Скачать или смотреть HS2’s giant viaduct segment factory starts production in the Midlands

  • HS2 Ltd
  • 2023-07-04
  • 22894
HS2’s giant viaduct segment factory starts production in the Midlands
high speed railwayunited kingdomHS2tunnellingtrainengineeringconstructioninfrastructureprojectrailrailwaysukcivil engineeringwest midlandswarwickshireKingsburyDelta Junction
  • ok logo

Скачать HS2’s giant viaduct segment factory starts production in the Midlands бесплатно в качестве 4к (2к / 1080p)

У нас вы можете скачать бесплатно HS2’s giant viaduct segment factory starts production in the Midlands или посмотреть видео с ютуба в максимальном доступном качестве.

Для скачивания выберите вариант из формы ниже:

  • Информация по загрузке:

Cкачать музыку HS2’s giant viaduct segment factory starts production in the Midlands бесплатно в формате MP3:

Если иконки загрузки не отобразились, ПОЖАЛУЙСТА, НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если у вас возникли трудности с загрузкой, пожалуйста, свяжитесь с нами по контактам, указанным в нижней части страницы.
Спасибо за использование сервиса video2dn.com

Описание к видео HS2’s giant viaduct segment factory starts production in the Midlands

HS2 has started production of 2,742 huge concrete segments which will be used to build HS2’s Delta Junction, a triangle-shaped series of viaducts that will take HS2 trains between London, the Midlands and the North.

The deck segments – which each weigh up to 80 tonnes – are being made on site at a purpose-built outdoor factory at Kingsbury, Warwickshire. The 55,000 square metre factory site employs around 1,000 people tasked with building the network of 9 viaducts at Water Orton and Coleshill, crossing motorways, roads and footpaths.

The pre-cast yard will turn out up to eight segments per day, with a variable weight between 50 and 80 tonnes. The segments are built in two different sizes, with the larger design - 2.6m length x 7m and 10 width x 3.5m height - used to support single and double track sections of the railway.

A 54 metre-long gantry crane lifts each segment during the manufacturing cycle, ahead of their onward transport to nearby Water Orton and Coleshill ready for on-site assembly.

HS2’s Delta Junction forms two spurs which branch off the main HS2 line between London and the North. Trains will travel between the Birmingham Curzon Street Station terminus and the North, and between Curzon Street and the South, accounting for around 10km of HS2 tracks.

Find out more at: https://www.hs2.org.uk/

Follow us on social media:
Twitter:   / hs2ltd  
Instagram:   / hs2ltd  
Facebook:   / hs2ltd  
LinkedIn:   / high-speed-two-hs2-ltd  

0:00 Introduction
0:13 The factory explained
0:50 Creating the segments
1:33 What will they be used for?
1:52 How do you feel that the factory is open?

#HS2 #Construction #Update

If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected].

Комментарии

Информация по комментариям в разработке

Похожие видео

  • О нас
  • Контакты
  • Отказ от ответственности - Disclaimer
  • Условия использования сайта - TOS
  • Политика конфиденциальности

video2dn Copyright © 2023 - 2025

Контакты для правообладателей [email protected]