Waverley2023 HD 1080p

Описание к видео Waverley2023 HD 1080p

The 27th of August was the last sailing of Waverley's summer season on the Clyde. She's down in London and the south east at the moment and will be back for a couple of days at the end of October.

Having contributed to the 2022 dry dock appeal I got a tour of the boiler room and the bridge. The boilers were replaced in 2020.
Waverley burns 700 litres of oil per hour (around £500). The sailing to the south coast takes 40 hours.

Комментарии

Информация по комментариям в разработке