Tags: #Oil & Gas Field, #Pipeline Construction Process, #Quality Control, #Inspection, #Pipe laying, # Pipe Stringing, #Pipeline Welding, #Pipeline Lowering, #Pipeline Tie-In, #Pipeline Auto Welding, #Pipeline NDT- RT, #Pipeline AUT, #Pipeline Welding Processes, #SMAW, #GTAW/SMAW, #FCAW #STT MAG #Pipeline Cold Bending, #Internal Clamp for Pipeline Weld Fit up, #Lowering, #Tie In, #Cathodic Protection,
Description:
This video is the over view of Pipeline construction process flow, methodology in brief. Construction project actually starts few months or few years before commencing site construction work.
• The design phase,
• The procurement phases
These are the underground process of a project, which are not visible at site.
All Steps involved in Pipeline Project in brief:
MAIN PHASES OF A LSTK PROJECT:
1) Site Survey and Key Design (Company)
2) Detailed Drawing Issued for Construction (Contractor's designer)
3) Procurement of Material (MR, PO)- By Contractor)
4) Logistic -Camp, work areas, transport, equipment
set up (Contractor/ Company)
5) HR/ Planning/ Contruction/ Safety/ Quality Document
Submission/ approval (Contractor)
6) Manpower & resources mobilisation (Contractor)
7) Construction Activities:
a) Right of way
b) Trench excavation
c) Line pipe stringing & receiving inspection
d) Welding & NDT
e) Lowering & Tie in Welding
f) Full Thrust Anchor (FTA) Installation
g) Pipe Cold Bending
h) Temperature Tie in Welding
i) Backfilling and Berming
j) Hydrotest (Internal Cleaning/ Gauging, Caliper Survey,
Hydrotest, Dewatering, Lay up with Air or N2, Chemical Cleaning)
k) Piping/ Electrical/ Instrumentation/ telecom work completion
l) Cathodic Protection (Temporary followed by permanent)
m) Complete Painting Coating Stencilling completion
n) Project Mechanical Completion (PMCC) reinstatement.
00:00 Introduction
01:07 Pipeline Route Survey
01:45 Design Detailing Phase
03:07 Procurement Phase
03:44 Contractor Logistics set up
05:55 Contractor Submission of Documents
07:42 Mobilisation
08:23 Construction Right of Way
08:55 Construction Civil Works
09:13 Pipe Stringing and receiving inspection
09:43 WPS, Welders NDT Qualification
10:52 Pipeline Welding
12:53 Pipeline Lowering & Tie in Welding
13:32 Full Thrust Anchor (FTA) Installation
14:34 Above Ground (AG) Pipeline WIth Support
15:05 Pipeline Bends
17:03 Backfilling & Berming
17:53 Pipeline Internal Cleaning, Calliper Survey & Hydrotest
23:19 Refined Pipeline Chemical Cleaning
24:08 Piping Electrical Instrumentation Work
24:22 Cathodic Protection (CP)
26:23 Painting & Coating
27:33 PMCC Project Mechanical Completion
28:18 Project completion Conclusion
Информация по комментариям в разработке