Major design changes in TEDBF

Описание к видео Major design changes in TEDBF

100 TEDBF fighter jets

As a part of Mission 470, India envisages to procure 470 indigenous fighter jets to boost its air power and achieve the self-reliance. The breakup of 470 fighter jets includes, 83 LCA Tejas Mark-1A and their follow-on order of 50 more for Indian air force. It also includes 108 LCA Mark2 & 126 AMCA fighter jets. Indian Navy also has planned to induct 100 TEDBF fighter jets. This sums up to 467 fighter jets.

26 Multirole Carrier Borne Fighters (MRCBF) waiting nod form MoD

Multiple media reports quoting source from MoD has reported that Rafale-M is the front runner for the 26-deck based fighter jet requirement of Indian Navy. Indian navy has submitted its report of the trial evaluation of Rafale-M and FA-18 super hornet to ministry of defence. Rafale-M has been chosen over F/A-18 as it more suitable in meeting the operational criteria and requirement. Now, the ball is in the court of MoD to decide and finalize the government-to-government deal on the Navy’s requirement of deck-based fighter jet.

IAF MRFA

During the Aero India 2023, the Air Marshal Narmdeshwar Tiwari, Deputy Chief of Air Force has said that IAF is hopeful of AoN for MRFA in next 3-4 months. It is a “budgetary decision” and how fast the aircraft are available. The AoN will begin the formal procurement process following which the IAF will issue the detailed Request for Proposal.

If Indian Air Force also opts for Rafale as a part of its MRFA requirement, the combined order of Rafale will be big for Dassault and will open opportunities to make them in India with more indigenously sourced components and developing the aerospace ecosystem.

TEDBF Rollout & expected timeline

While the 26 MRCBF are being procured as a stop gap arrangement, TEDBF is going to be the future backbone of Indian Navy deck-based fighter jet. Speaking on the side-lines of Aero India, Navy Chief Adm. R. Hari Kumar said that they may get upto 45 TEDBF by 2040.

During the defence expo 2022, ADA has reported that the TEDBF program can be executed in 8-years after the funding approval from CCS is given.

ADA is expecting funding clearance from the Cabinet Committee on Security by June 2023. Once its approved, it will take another 4-4.5 years for roll out of the first prototype, which means that the first prototype can be expected around 2028 and fighter jet can enter into production by the year 2032.

As per latest report from The New Indian Express: The Ministry of Defence is likely to clear a budget of over Rs 14,000 crore for the development of four prototypes of the twin-engine deck-based fighters.

Iron Bird – ADA would need 3 for LCA Mark2, AMCA & TEDBF

The funding sanction will determine the timeline of the aircraft rollout.

The most component of prototype development is the iron bird.



ADA is in process of building new Iron Bird facility for ‘Futuristic Manned Aircrafts’ which will be used to test the flight control systems of AMCA and LCA AF MK2. As per our recent discussion with ADA, the process has reached an RFP stage. Its going to take around 2 years to setup the iron bird for LCA Mark-2.

However, there are no news on Iron bird for TEDBF. ADA would ideally need 3 iron bird for prototypes of LCA Mark2, AMCA & TEDBF.

TEDBF Design Changes observed

One of the major observations from Aero India 2023 has been change in the design of TEDBF.

The new design seems to be much more refined design of TEDBF incorporating the features of AMCA & Rafale. Some visible changes are also noticeable in the nose cone and DSI intake which looks much better.

Other details on TEDBF

Besides, the change in specifications, few more details where shared about the TEDBF fighter jet. The aircraft will have network centric capability along with multi sensor data fusion integrated with advanced sensors like AESA Radar, IRST, Unified EW suite, and MAWS.

Join this channel to get access to perks:
   / @indiandefenseanalysis  

**WHOMSOEVER IT MAY CONCERN
Most of the pictures clip or BGM included in the Video
Belongs to their Respected Owners and we do not claim rights.
We are using them under following act:
UNDER SECTION 107 OF THE COPYRIGHT ACT 1976, ALLOWANCE IS MADE FOR "FAIR USE" FOR PURPOSES SUCH AS CRITICISM,
COMMENT, NEWS REPORTING, TEACHING, SCHOLARSHIP, AND RESEARCH. FAIR USE IS A USE PERMITTED BY COPYRIGHT STATUTE THAT MIGHT
OTHERWISE BE INFRINGING. NON-PROFIT, EDUCATIONAL OR PERSONAL USE TIPS THE BALANCE IN FAVOR OF FAIR USE.
Follow us on social media:
  / analysisdefense  
https://indiandefenseanalysis.com/

==============THANKS FOR WATCHING!================
PLEASE LIKE SHARE & SUBSCRIBE: "INDIAN DEFENSE ANALYSIS"

Music: Eternal Garden - Dan Henig

Комментарии

Информация по комментариям в разработке