MRT KAJANG LINE (SBK LINE) + MRT PUTRAJAYA LINE (SSP LINE) FROM KAJANG TO PUTRAJAYA SENTRAL

Описание к видео MRT KAJANG LINE (SBK LINE) + MRT PUTRAJAYA LINE (SSP LINE) FROM KAJANG TO PUTRAJAYA SENTRAL

Recorded in 17 April 2023
MRT Kajang Line
Rode Set: Guiding Light Set 11
From: Kajang to Kwasa Damansara

MRT Putrajaya Line
Rode Set: Ducky Set 10
From: Kwasa Damansara to Putrajaya Sentral

In this video, I will take the full ride of 103.7km from Kajang Station (MRT Kajang Line) to Putrajaya Sentral Station (MRT Putrajaya Line) including an interchange at Kwasa Damansara Station. The journey starts at 1148 hrs from Kajang Station to Kwasa Damansara Station the estimated time of approaching at Kwasa Damansara Station is in between 1309 hrs and including an interchange to MRT Putrajaya Line. The jouney for MRT Putrajaya Line from Kwasa Damansara Station starts at 1313 hrs from Kwasa Damansara Station to Putrajaya Sentral Station the estimated time of approaching at Putrajaya Sentral Station is in between 1434 hrs. The entire journey took me about 2.7 hours.

_______________________________________________________________________

MRT Kajang Line
The MRT Kajang Line (SBK Line) train switch platform from the railroad switch at Sungai Buloh station. Starting 16 June 2022, the Sungai Buloh Station will be the part of MRT Putrajaya Line (SSP Line) station includes Kampung Selamat and Kwasa Damansara station. In addition, Kwasa Damansara wil be the terminal station starting 16 June 2022.

The MRT Kajang Line (SBK Line) is a Mass Rapid Transit (MRT) line servicing the Klang Valley, Malaysia. It is the ninth rail transit line and the second fully automated and driverless rail system in the Klang Valley area after the LRT Kelana Jaya Line. It is a part of the Klang Valley Integrated Transit System. The line is numbered 9 and colored Green on official transit maps.

For more information about MRT KG Line:
https://www.mymrt.com.my/projects/kaj...
https://en.wikipedia.org/wiki/Kajang_...

_______________________________________________________________________

MRT Putrajaya Line
The MRT Putrajaya Line, also known as MRT 2, is the second Mass Rapid Transit (MRT) line in Klang Valley, Malaysia, and the third fully automated and driverless rail system in the country. It was previously known as the Sungai Buloh–Serdang–Putrajaya Line (SSP) Line. The line stretches from Kwasa Damansara to Putrajaya and runs through densely populated areas such as Sri Damansara, Kepong, Batu, Jalan Ipoh, Sentul, Kampung Baru, Jalan Tun Razak, KLCC, Tun Razak Exchange, Kuchai Lama, Seri Kembangan and Cyberjaya.

Phase 1 operations of the line between Kwasa Damansara and Kampung Batu commenced on 16 June 2022. Phase 2 (From Kentonmen to Putrajaya Sentral Station) which will cover the remaining line including the underground stretch, will open on 16 March 2023.

The line is numbered 12 and colored yellow on official transit maps.

The line was developed and is owned by MRT Corp but operated as part of the Rapid KL network by Rapid Rail. It also forms part of the Klang Valley Integrated Transit System.

The newly built length of the line 52.2 km in length but includes 5.5 km of the MRT Kajang Line which was transferred to the MRT Putrajaya Line. The line includes a 13.5 km underground section. A total of 37 stations, 11 of them underground (Included 2 provisional stations that is Bandar Malaysia Utara and Bandar Malaysia Selatan Station), were built.

For more info about MRT Putrajaya Line:
https://www.mymrt.com.my/projects/put...
https://en.wikipedia.org/wiki/Putraja...

_______________________________________________________________________

Please like and subscribe for more videos from me!

Follow me on Instagram:
  / venniisajane  

My back up Instagram account:
  / venniisajane_backup  

My Private Instagram account:
  / x.wpdls_  

Join the Trainiiverse!😉 All you have to do is click the subscribe button and click the bell🔔 icon to get notify when there's a new video.

Please like and subscribe for more videos from me!

#JOMNAIKMRT #MRTKajangLine #MRTPutrajayaLine #KajangToPutrajayaSentral #FullRide

© 2023 Venniisa Says. All Rights Reserved. Unauthorized Re-uploading or Re-sampling without permission is prohibited and is subjected to copyright.

Комментарии

Информация по комментариям в разработке