HELLO PO SA LAHAT.. WELCOME BACK TO MY CHANNEL RANDY YERRO OFW SIMPLE HOUSE VLOG..
This House🏠🏠🏠 Video Own by Sir
From Nueva Ecija. PHILIPPINES
CONGRATS SIR GOD BLESS.🙏🙏🙏
Start Building a House January 18 2019
HOUSE AND LOT 1,375,633 PHP
LOT. 430sqm 330,000 php
House Size 10x15 meter 150sqm
3 bed rooms
2toilet and bath
1laundry room
Sala
kitchen
Garage
Qty Item Price/Unit Total
90pcs 12mm 188 = 16,920
700pcs 10mm 130 = 91,000
350 sacks Holcim Cement 230 =80,500
80pcs Coco lumber 2x2x12 100 = 8,000
50pcs Coco Lumber 2x4x12 200 = 10,000
45 load Buhangin 1,400 = 63,000
25 load Buhangin Mixed 1,300 = 32,000
10pcs Plywood Marine1/2 650 = 6,500
40 kilo Pako 60 = 2,400
92 kilo Alambre #16 60 = 5,520
900pcs Hollow Block D5 12 = 10,800
4,100pcs Hollow Block D4 10 = 41,000
Electricity Materials and Plumbing
QTY ITEM PRICE/UNIT TOTAL
8pcs Orange Pipe #4 300 = 2,400
12pcs Orange Pipe #2 150 = 1,800
8pcs Orange Elbow #4 75 = 600
2 pcs Orange T connection 4x2 85 = 170
1pcs Orange Y connection 4x4 85 = 85
12pcs orange Elbow#2 25 = 300
2pcs Clean Out #4 85 = 170
12 pcs Blue Pvc Pipe 1/2 60 = 720
10pcs Tapelon 15 = 150
2 Liter Solvent Cement 380 = 760
17pcs G.I Elbow 1/2 30 = 510
10pcs G.I connector 1/2 30 = 300
MATERIALS COST TOTAL 375,605
LABOR COST TOTAL 150,242
STRUCTURAL WITH BACKFILLING 525,847 php
STEEL TRUSSES MATERIALS
Qty Item Price/Unit Total
44pcs Angle Bar 1/4×2 Green 680 = 29,920
40pcs Angle Bar 1/4×1 1/2 Green 520 = 20,800
115pcs Angle Bar 3/16×2 Yellow 580 = 66,700
17pcs C Purlins 2/7×1.5 930 = 15,810
40kilo Welding Rod special 135 = 5,400
12 Gallon Epoxy Primer Gray 650 = 6,720
4 Gallon Lacquar Thinner 200 = 800
6pcs Paint Brush 15 = 90
8pcs Baby Roller 50 = 400
4pcs Paint Tray 35 = 140
7pcs Toka Cutting disk #14 200 = 1,400
Materials Total Cost148,180
Labor Total Cost 59,272
STEEL TRUSS WITH LABOR 207,452 PHP
TilesPan Color Gray and Spandrel
with Installation cost 178,114 php
Qty Item Price/ Unit Total
13pcs Annaloc Windows 45,000
Panel Door 5pcs 4,000 = 20,000
Hamba 5pcs 1,800 = 9,000
Cr Door 3pcs 3,000 = 9,000
Cr Bowl 2pcs 3,500 = 7,000
Door Knob Lock 5pcs 650 = 3,250
Dealt Bolt Lock 2pcs 550 = 1,000
Palitada Finewall/Windows 21,000
Total Cost 115,350
Labor Cost 18,870
OVERALL MATERIALS COST 791,749 PHP
OVERALL LABOR COST 253,844
HOUSE MATERIALS WITH LABOR TOTAL COST 1,045,633 PHP
HOUSE IS LOCATED IN NUEVA ECIJA PHILIPPINES
Dont Forget to Like and Subcribes😊
Thank You for Watching and Have a Good Day💗
My Friend Channel😊
https://www.youtube.com/channel/UCnTQ...
#ofwhousesinthephilippines #buildingahousestepbystep
💝💝💝🏠🏠🏠💝💝💝
OFW SIMPLE HOUSE VLOG
• Katas ng OFW, OFW SIMPLE HOUSE STORY ...
• OFW SIMPLE HOUSE Floor Plan with kunt...
• OFW SIMPLE HOUSE Steel Trusses Step b...
• OFW SIMPLE HOUSE COLOR ROOF 73,000 wi...
• OFW SIMPLE HOUSE GUIDELINES SA PAG PP...
• OFW SIMPLE HOUSE TIPS KUNG SAAN GAGAM...
• BAYANIHAN SA PAG GAWA NG SMALL CAR PORCH
• OFW SIMPLE HOUSE PAGPAPAGAWA NG SPAN...
• OFW SIMPLE HOUSE COLOR ROOF EURO ROYAL
• Katas ng OFW, OFW SIMPLE HOUSE STORY ...
BEBS YERRO HOUSE VLOG
A BEAUTIFULL HOUSE
• Bungalow house design Part1
• Bungalow house design Part2
• Bungalow house design Part3
• Bungalow house design Part4
• Bungalow house design Part5
• Bungalow house design Part6
• Bungalow house design Part7
Информация по комментариям в разработке