Preparing for our ASHP installation

Описание к видео Preparing for our ASHP installation

This video covers the jobs we needed to do to prepare for our Air Source Heat Pump (ASHP) installation. Planning application approved and an installation date given. What we needed to do before our Vaillant AroTHERM+ 7kW ASHP was installed.

It covers setting up networking points, clearing out the location for the ASHP, cleaning behind the radiators, adding PT1000 temperature sensors to the myenegi eddi.

Open Energy Monitoring for Heat Pump:
https://docs.openenergymonitor.org/ap...

🔴 Octopus Energy £100 (shared) referral link: https://share.octopus.energy/sky-gupp...

🔴 Setup:
4.0kW solar array, installed Sept 2011, 16 x 250w Sanyo HIT-H250E01 panels
3.8kW SMA Sunny Boy inverter
2.34kW solar array, installed Oct 2019, 6 x SunPower Maxeon 3 390w panels
2kW Solis Mini inverter
Tesla Powerwall 2 (Gateway 1), installed Dec 2018
Tesla Model 3 AWD Performance, delivered 28th Sept 2019
Hyundia Kona SE 64kW, delivered 1st July 2019 - sold Dec 2021
Renault Zoe 22kW, delivered 5th Jan 2022
myenergi eddi, installed July 2019
myenergi zappi v1, installed Dec 2018
myenergi harvi x 2
myenergi hub
myenergi iOS app
Kaifa MA120 SMETS2 smart meter
Based in Rushden, East Midlands, UK

🔴 Subscribe for free YouTube: https://www.youtube.com/johntisbury?s...

✅ Recommended playlists:
Tesla Powerwall 2, solar and EVs
https://www.youtube.com/playlist?list...

✅ FOLLOW ME:
Instagram:   / johntisbury.  .
Twitter:   / johntisbury  

Комментарии

Информация по комментариям в разработке