Tile Backsplash + Future Coffee Bar | Mad County Build

Описание к видео Tile Backsplash + Future Coffee Bar | Mad County Build

We're going to be bringing you some updates from the MAD County Build. We finish the tile backsplash in the kitchen We also cut out drywall and repair to move the water line and add electrical boxes for a future coffee bar.

Mad County Build Series 100+ Videos
   • Mad County Build  

0:00 Project Overview
0:55 Tools Needed
3:09 First Row / Course
7:03 Tile Saw
9:57 Moving Water Line + Electrical
11:23 Cutting Drywall
12:38 Drywall Screw Tip
14:06 Adding Electrical
15:12 Drywall Repair
15:37 Tile Last Wall
16:09 Low Voltage Switch
18:08 Grout

Thanks for watching! Subscribe, Like, + Share if you enjoyed this video!

Amazon Store | Project Tools Listed by Category
www.amazon.com/shop/marshallremodel

Finishes, Fixtures, Decor, + More
https://www.liketoknow.it/marshallrem...

Daily Updates
https://linktr.ee/mrpostframe

Thanks for stopping by our channel! We are self building our family of 5 a post frame barndominium in Iowa along with the life we’ve always dreamed of.

The goal of our channel is to inspire others to build their dream by providing education on construction and an in depth look at how we’ve gotten to this place.

Email:
[email protected]

Mailing:
PO Box 11
Winterset, IA 50273

#postframe #utilities #barndominium

ONPTINLWKNHFQMGZ
DBWHIZTX3IZXDYDY

Комментарии

Информация по комментариям в разработке