Logo video2dn
  • Сохранить видео с ютуба
  • Категории
    • Музыка
    • Кино и Анимация
    • Автомобили
    • Животные
    • Спорт
    • Путешествия
    • Игры
    • Люди и Блоги
    • Юмор
    • Развлечения
    • Новости и Политика
    • Howto и Стиль
    • Diy своими руками
    • Образование
    • Наука и Технологии
    • Некоммерческие Организации
  • О сайте

Скачать или смотреть Studio Construction - Day 37 - Cathedral Roof Framing

  • Alan Yates
  • 2023-05-06
  • 210
Studio Construction - Day 37 - Cathedral Roof Framing
vk2zay
  • ok logo

Скачать Studio Construction - Day 37 - Cathedral Roof Framing бесплатно в качестве 4к (2к / 1080p)

У нас вы можете скачать бесплатно Studio Construction - Day 37 - Cathedral Roof Framing или посмотреть видео с ютуба в максимальном доступном качестве.

Для скачивания выберите вариант из формы ниже:

  • Информация по загрузке:

Cкачать музыку Studio Construction - Day 37 - Cathedral Roof Framing бесплатно в формате MP3:

Если иконки загрузки не отобразились, ПОЖАЛУЙСТА, НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если у вас возникли трудности с загрузкой, пожалуйста, свяжитесь с нами по контактам, указанным в нижней части страницы.
Спасибо за использование сервиса video2dn.com

Описание к видео Studio Construction - Day 37 - Cathedral Roof Framing

Started quite wet and dreary but got somewhat better until the late afternoon when it started raining again very heavily so I quit a little early.

Richard came to help again. Today was mostly rafters, I cut, he placed. There was some clean-up of the north east gable wall so all the look-outs would be perfectly placed over the dropped gable end. I still need to cut all the blocking for the gable ends...

I also added a couple of extra studs under the end beam of the loft floor at the walls for extra support, removing a small shear moment in the top plates and returning the gravity load of the beam directly into the middle piers.

The cathedral part of the roof is now basically complete. I cut the flying/barge rafters for both ends and moved all the 2x8 subfacia boards to a staging area. I also had to move a great number of 2x12s and other boards to get access to the rest of the rafter 2x6s. Some extra 2x6 are arriving in a few days for the final dormer framing (and they need a landing spot out in the driveway!). The dormer loft design change requires some extra 8-foot for the dormer gable walls, rafters and cripple studs for the cheek walls. The ridges will be 2x10s which I already have.

Комментарии

Информация по комментариям в разработке

Похожие видео

  • О нас
  • Контакты
  • Отказ от ответственности - Disclaimer
  • Условия использования сайта - TOS
  • Политика конфиденциальности

video2dn Copyright © 2023 - 2025

Контакты для правообладателей [email protected]