Chemical tanker ship -Walkthrough

Описание к видео Chemical tanker ship -Walkthrough

Chemical tanker ship -Walkthrough
   • Chemical tanker ship -Walkthrough  

For framo panel follow this link
   • FRAMO PANNEL IN CARGO CONTROL ROOM(Po...  

CARGO CONTROL ROOM FAMILIARISATION -Part 1/3
   • CARGO CONTROL ROOM TRANING -Part 1/3  

CCR PART 2/3( Operation of loading and discharging valves)
   • CCR PART 2/3( Operation of loading an...  

TIMECODE
00:00- intro
01:09- catwalk
02:10- pv valves(pressure and vaccum valves)
03:53: Manifold area:
04:13-About emergency shutdown system(ESD)
05:30-Drip tray
05:53-Emergency shower and emergency shower
08:10-Deck crane(hose handling crane)
08:35-Sample locker
11:10-Tank cleaning machine
13:13-high level and overfill alarm sensor
13:28- cargo sensors
14:01- pump stack area(drop line,discharge line,pv line)
17:33-isolation valve
18:17-midship area

Комментарии

Информация по комментариям в разработке