Panguil Bay Bridge Opening in June 2024

Описание к видео Panguil Bay Bridge Opening in June 2024

Here's the latest progress update of the longest bridge in Mindanao, the Panguil Bay Bridge (PBB), as of July 2023.

P7.3 Billion Project
3.169-KM Panguil Bay Bridge as of July 2023
73% complete as of July 2023
90% complete by December 2023
95% complete by March 2024
Open to vehicular traffic by June 2024
Reduce travel time to only 7 minutes from 2.5 hours
Connecting Tangub in Misamis Occidental and Tubod in Lanao del Norte

#PanguilBayBridge #PanguilBay #tangubcity #tubod #lanaodelnorte #misamisoccidental

Watch more aerial videos here: https://www.projectlupad.com

Subscribe to Project LUPAD for more aerial videos.

LUPAD means FLY. Project LUPAD is a digital media platform featuring the latest project updates, tourist spots, news & events in the Philippines.

Follow us on Facebook:   / projectlupad  
Follow us on Twitter:   / projectlupad  
Follow us on Instagram:   / projectlupad  

To all drone operators and enthusiasts in the Philippines, join Drone Pilots Philippines   / dronepilotsphilippines   a group of amateur and professional drone operators in the Philippines.

This video is copyrighted. Feel free to share or embed the video. It is for personal viewing and not for public use or re-upload without permission. If you want to use or re-upload some or all parts of the video, please contact us via our Facebook page   / projectlupad  . or email us at contact [at] projectlupad.com.

For your aerial photography needs (HD, Panorama or 360 degrees photo), aerial videography needs (4K, YouTube or Facebook Live Stream), and professional drone training, send us a message   / projectlupad   or email us at contact [at] projectlupad.com

Services we offer:
1. Aerial Services
2. Video Services
3. Photo Services
4. Drone Services
5. 360 Services
6. Promotion Services

Contact us today!

Visit https://www.projectlupad.com
Or message us   / projectlupad  

Комментарии

Информация по комментариям в разработке