How to Create Assign and filter Activity Codes in Primavera P6 | Activity codes for schedule P6 |

Описание к видео How to Create Assign and filter Activity Codes in Primavera P6 | Activity codes for schedule P6 |

Oracle Primavera P6 provides the capability to setup and assign Activity Codes to activities in your projects. Activity Codes are used to classify, categorize, and organize activities based on your organization's reporting needs. Activity Codes are usually created and assigned at the beginning of the project.

Planning – P6 Channel videos Link:
   / @planningp6  

40- How to Conduct Project Delay Analysis | Prepare Extension of Time Claim | EOT | Planning P6 | Claims

   • How to Conduct Project Delay Analysis...  

41- How to Customize Tool Bars In P6 | Add Remove Tool Bars In Primavera P6 | Planning P6 | Primavera |

   • How to Customize Tool Bars In P6 | Ad...  

42- How to Assign and Upload Work Products and Documents in primavera p6 | WPs and Doc in P6 | Primavera

   • How to Assign and Upload Work Product...  

43- How to Add and Assign Expense cost in primavera p6 project | Cost controlling | Cost Tracking | P6

   • How to Add and Assign Expense cost pr...  

44- How to Add and Change Currencies in Primavera P6 | Change Exchange Rates in Primavera P6 | P6

   • How to Add and Change Currencies in P...  

45- How to Change and Recover Password of Primavera P6 Software | Primavera P6 | Planning P6 | Learning

   • How to Change and Recover Password of...  

46- How to Format Time Units and Dates in primavera P6 | Format Shutdowns and Projects | Planning P6 |

   • How to Format Time Units and Dates in...  

47- How to Highlight activities with the specific range in primavera p6 | use spotlight and filters | p6

   • How to Highlight activities with the ...  

48- How to Extract spread sheets of Resource Assignment in primavera P6 | Manhours Quantity and Cost P6

   • Видео  

49- How to Create S Curve in excel by using primavera p6 data | prepare project histogram in excel | p6

   • How to Create S Curve in excel by usi...  

50- How to use Filldown Option in primavera p6 | Copy and duplicate activities values in p6 | primavera

   • How to use Fill down Option in primav...  

51- How to Assign and Remove Multiple Resources in Primavera P6 Schedule | Multiple Activities P6 | Tips

   • How to Assign and Remove Multiple Res...  

52- How to Assign Cost Loading from Excel to Primavera P6 Import and Export | Tips and Tricks | Planning

   • How to Assign Cost Loading from Excel...  

53- How to add Assign and change Resource Rate Type in Primavera P6 | Add resource Rates in P6 | P6 |

   • How to add Assign and change Resource...  

54- How to Assign Overtime Factor to Resources in primavera P6 | Calculate overtime cost in primavera p6

   • How to Assign Overtime Factor to Reso...  

55- What is the difference between Retained Logic and Progress Override and Actual Dates in Primavera P6

   • What is the difference between Retain...  

56- How to track and trace out of sequence activities in primavera p6 | apply filter in p6 | Planningp6

   • How to track and trace out of sequenc...  

57- How to assign and change Relationships by using Excel to primavera P6 | lag and type relationships

   • How to assign and change Relationship...  

58- How to Assign and change and remove Relationship of activities from Gantt Chart in Primavera P6 | P6

   • How To Assign and Change and Remove R...  

59- How to Use Trace Logic In Primavera P6 | Save Layout and Print Trace Logic | Planning P6 | Projects

   • How to Use Trace Logic in Primavera P...  
60- How To Add Assign Calculate Est Weight Apply Top Down Estimation In Primavera P6 | Weightages | p6 |

   • How To Add Assign Calculate Est Weigh...  

61- How to Create Assign and filter Activity Codes in Primavera P6 | Activity codes for schedule P6 |

   • How to Create Assign and filter Activ...  
#activitycodes,#PlanningP6,#PrimaveraP6

Комментарии

Информация по комментариям в разработке