Torch-on drips

Описание к видео Torch-on drips

This video shows me torching on drips. They have been cut at 309 mm strips and tacked with 30 mm clouts and then a fibre drip board has been fitted over them to maintain the straight edge. I always apply bituminous primer to my fibre board too. A better video would have showed the work prior to the torching on but it gives an idea of how it goes. The cap sheet will be laid to within about 29 mm from the edge of the roof so it’s not essential for it to be too tidy on the top surface.

Комментарии

Информация по комментариям в разработке