Rubber Dam (4) application (dam over clamp) and removal – Maxillary - Arabic عربي

Описание к видео Rubber Dam (4) application (dam over clamp) and removal – Maxillary - Arabic عربي

Rubber Dam and clamp application and removal using the dam over clamp technique on a maxillary tooth

- To learn about the rubber dam instruments / kit, watch the video:    • Rubber Dam (1) instruments / kit- Ara...  
- To learn about the rubber dam preparation and clamp ligation, watch the video:    • Rubber Dam (2) preparation & clamp li...  
- To learn about the rubber dam and clamp application techniques (dam over clamp, clamp over dam, simultaneously / clamp in dam), watch the video:    • Rubber Dam (3) &clamp application tec...  
- To learn about amalgam cavity preparation and restoration tools and setup, watch the video:    • Amalgam cavity preparation & restorat...  
- To learn about resin-based composite cavity preparation & restoration instruments and tools setup, watch the video:    • Resin composite cavity preparation & ...  

Subscribe for more Preclinical Operative Dentistry videos:    / @drafnanoalzain  

Music: https://www.bensound.com

--- Contents of this video ---

00:00 – Introduction
00:14 – Title: Rubber dam application (dam over clamp technique) and removal – Maxillary
00:23 – Rubber dam application (dam over clamp) and removal
00:48 – Application
00:49 – Application: 1. Prepare the oral cavity
01:06 – Application: 2. Ligate the clamp
01:12 – Application: 3. Test the clamp
03:45 – Application: 4. Rubber dam application: (1) place the posterior anchorage
06:09 – Application: 4. Rubber dam application: (2) place the anterior anchorage
07:24 – Application: 5. Attach the frame
08:00 – Application: 6. Make sure the floss is outside
08:09 – Application: 7. Insert the remaining teeth in their holes with finger first
08:34 – Application: 8. Floss between the teeth to insert & invert the rubber dam proximally
09:12 – Application: 9. Invert the rubber dam facially and palataly using a plastic filling instrument
10:23 – Application: 10. Make sure the rubber dam & frame are centered with no wrinkles
10:47 – Removal
11:01 – Removal: 1. Stretch the rubber dam
11:07 – Removal: 2. Insert the scissors tip & point it occlusally until you see the tip clearly
11:19 – Removal: 3. Cut the septa
11:49 – Removal: 4. Remove the anterior anchorage
11:59 – Removal: 5. Remove the posterior anchorage with the frame & rubber dam sheet all together
12:22 – Removal: 6. Examine the rubber dam sheet
12:30 – Removal: 7. Examine the patient mouth for rubber dam remnants: a. with a dental mirror
12:34 – Removal: 7. Examine the patient mouth for rubber dam remnants: b. with a dental floss
12:43 – Removal: 8. Clean the patient’s mouth & lips

Instagram: @afnanalzain
Twitter: @afnanalzain
Telegram Channel: Dr. Afnan O. Al-Zain / t.me/afnanalzain
Email: [email protected]

Комментарии

Информация по комментариям в разработке