Long Wall Short Wall Method | Estimation of a building by Long Wall and Short Wall Method

Описание к видео Long Wall Short Wall Method | Estimation of a building by Long Wall and Short Wall Method

This video explains in detail about long wall and short wall method. Estimation of a two room building is done by long wall short wall method and the quantities found are earthwork in excavation, lime concrete in foundation, brickwork in foundation, brickwork till plinth level, quantity of DPC that is Damp Proof Course and brickwork in superstructure.

Explanation is done by Prof. Swati Joshi.

Centerline Method of Estimation Part 1 :    • Estimation using Center Line Method (...  

Centerline Method of Estimation Part 2 :    • Estimation using Centerline Method (P...  

Centerline Method of Estimation Part 3 :    • Estimation of residential building Pa...  

My Phone : https://amzn.to/311uFDW
Amazon Basics 50-Inch Lightweight Tripod with Bag : https://amzn.to/3ayCdkG
Laptop : https://amzn.to/3hi2yGp
Estimating and Costing by B.N.Dutta : https://amzn.to/2Eanu3c
Estimating and Costing by Rangwala : https://amzn.to/31X7gTi

#longwallshortwallmethod #estimationbylongwallshortwallmethod

Комментарии

Информация по комментариям в разработке