New building project in Stockholm. Efficient material handling

Описание к видео New building project in Stockholm. Efficient material handling

Our customer, Cre8 AB in Sweden, has sent us this fantastic video! They are using the logistics solution Liftroller to transport plasterboards into the building. We're thrilled to see how smoothly and efficiently the workers are handling these heavy packages of plasterboards!

Faq about The Liftroller system; Safe and efficient construction site logistics
This Scandinavian solution improves safety on craning operations at construction sites. With this solid roller plattform, materials and construction waste can be moved in and out of the desired floor faster, easier and safer.

The Liftroller®system creates a transport line from the outside of the building to the inside on the floor on which the materials will be used. The materials are loaded onto the Liftroller using a crane and then pulled through the aperture on rollers. This allows the workers to transport heavy items quickly, easily and safely without heavy lifting.
🔸Fast, easy and safe materialhandling.
🔸Sutiable for newbuild projects
🔸Suitable for renovation projects
🔸Roll building materials directly onto the floors.
🔸Roll building waste directly out of the floors.

Visit www.liftroller.com for more information.

Комментарии

Информация по комментариям в разработке