Rupsha Bridge- Largest rail bridge in Bangladesh completed under India’s LOC | Papa Construction

Описание к видео Rupsha Bridge- Largest rail bridge in Bangladesh completed under India’s LOC | Papa Construction

Title- Rupsha Bridge- Largest rail bridge in Bangladesh completed under India’s LOC | Papa Construction
suggested video-
Akhaura Agartala Rail link Project    • Akhaura Agartala Rail line Project | ...  
Kaladan Project-   • Kaladan Multi-Modal Transit Transport...  
Dhubri to Phulbari bridge-   • Dhubri to Phulbari bridge | Dhubri br...  
Megaprojects in Guwahati-   • Megaprojects in Guwahati Assam | Guwa...  
Rupsi Airport Assam-   • Rupsi Airport Assam | Rupsi Airport o...  
Longest bridges in India-   • Longest bridges in India | under cons...  
Tallest bridge in the world-   • Tallest bridge in the world | Jiribam...  
Chenab Railway Bridge-   • Chenab Railway Bridge latest update |...  
Atal Tunnel-   • World's longest tunnel in India at100...  
Banihal railway tunnel-   • Banihal railway tunnel | Under constr...  
---------------------------------------------------
To subscribe the channel-    / @papaconstruction  
Facebook Page-   / papa.constrn  
Instagram-   / papa_constrn  
Twitter-   / papa_constrn  
Email- [email protected]
----------------------------------------------------------
Rupsha Rail Bridge, part of the Khulna-Mongla port rail line project being taken up under the government of India Line of Credit (LOC) extended to the government of Bangladesh, was completed on June 25. The Rupsha Rail Bridge is a 5.13 kms broad-gauge single-track railway bridge constructed by Indian EPC Contractor M/s L&T and has connected Khulna with the Mongla port city via a rail line. The Rupsha Railway Bridge and the Khulna-Mongla port rail line will greatly facilitate the to and fro transportation of goods and the enhanced connectivity. This will also facilitate accessibility to Mongla Port and will improve market access for local businesses including for agricultural produce of farmers in the region. It is also expected to positively impact tourism to prominent spots in the south-western part of Bangladesh. The bridge has been constructed over the Rupsha tidal river, and this was a challenging engineering feat as it required specialized base grouting technology for piling work. A total of 856 pile foundations were constructed on viaduct sections and 72 pile foundations were constructed for the steel bridge section with an average pile length of 72 m. The bridge also has additional features such as navigation fender piles upstream and downstream of the pier, for ensuring navigation safety in the river. The Rupsha Rail Bridge as part of the Khulna-Mongla Port Rail Line Project has been completed under the Indian Line of Credit extended to the Bangladesh government.

#PapaConstruction #RupshaBridge #Bangladesh #AkhauraAgartalaRailLine #KaladanProject

Комментарии

Информация по комментариям в разработке