Logo video2dn
  • Сохранить видео с ютуба
  • Категории
    • Музыка
    • Кино и Анимация
    • Автомобили
    • Животные
    • Спорт
    • Путешествия
    • Игры
    • Люди и Блоги
    • Юмор
    • Развлечения
    • Новости и Политика
    • Howto и Стиль
    • Diy своими руками
    • Образование
    • Наука и Технологии
    • Некоммерческие Организации
  • О сайте

Скачать или смотреть School Construction Savings with Tilt-Up Construction – Save up to 20%!

  • Tilt Wall Ontario Inc.
  • 2019-12-10
  • 127
School Construction Savings with Tilt-Up Construction – Save up to 20%!
  • ok logo

Скачать School Construction Savings with Tilt-Up Construction – Save up to 20%! бесплатно в качестве 4к (2к / 1080p)

У нас вы можете скачать бесплатно School Construction Savings with Tilt-Up Construction – Save up to 20%! или посмотреть видео с ютуба в максимальном доступном качестве.

Для скачивания выберите вариант из формы ниже:

  • Информация по загрузке:

Cкачать музыку School Construction Savings with Tilt-Up Construction – Save up to 20%! бесплатно в формате MP3:

Если иконки загрузки не отобразились, ПОЖАЛУЙСТА, НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если у вас возникли трудности с загрузкой, пожалуйста, свяжитесь с нами по контактам, указанным в нижней части страницы.
Спасибо за использование сервиса video2dn.com

Описание к видео School Construction Savings with Tilt-Up Construction – Save up to 20%!

Building a new school or similar educational facility? Reduce your construction schedule by 30%, and save 20% on your building costs when you use Tilt Wall’s superior building product: insulated, load-bearing walls that are poured on site.

Consider tilt-up construction’s structural engineering solution: it’s safe, durable, non-combustible and tilt-up buildings stand up very well in high-wind storms. It also has great architectural versatility and appeal.

Tilt Wall’s experienced team assists our school clients in designing buildings with lasting beauty and value. It is our objective to build lasting relationships, and impact the lives of school children in a positive way – by providing quality load-bearing products and structural design services that exceed expectations.

School boards that choose tilt-up concrete construction do not have to end up with simple grey boxes. We offer customers a wide range of formliners, reveals, stone imbeds, coloured concrete and stains.

There are many benefits to using tilt-up construction:
Design flexibility
Energy efficiency
Construction speed
Reduced costs (lower construction costs and long-term operational costs)

Tilt Wall has completed more than 40 tilt-up concrete-poured-panel buildings, including hotels, schools, offices, warehouses, sport facilities, food storage facilities and livestock housing buildings. With almost 1,000,000 square feet of concrete building wall panels installed, Tilt Wall has quickly become a green building leader in Ontario.

Is tilt-up construction the solution for your project? Talk with us about your plan and allow us to answer any questions you may have.

Facebook:   / tiltwallontario  
Twitter:   / tiltwallontario  
Instagram:   / tiltwallontario  
LinkedIn:   / tiltwall-ontario-inc.  
Learn more at https://tiltwall.ca/
Tel: 519-602-2990
[email protected]

#schoollife
#education
#savings
#tiltup
#concrete
#thinkconcrete
#didyouknow
#tdchs

Комментарии

Информация по комментариям в разработке

Похожие видео

  • О нас
  • Контакты
  • Отказ от ответственности - Disclaimer
  • Условия использования сайта - TOS
  • Политика конфиденциальности

video2dn Copyright © 2023 - 2025

Контакты для правообладателей [email protected]