Humongous 200ft super load arrives on site | Intel Ohio One

Описание к видео Humongous 200ft super load arrives on site | Intel Ohio One

The latest Ohio super load arrives onsite at Intel's construction site. This air separation unit (ASU) weighs 916,000 pounds and the transport rigs and trailers were 280-plus feet in length.

It joins two other ASUs in the lay-down yard with another one expected to arrive soon.

More info about Ohio Super Loads:
https://www.transportation.ohio.gov/a...

Please like and subscribe!    / @lukateake  

Комментарии

Информация по комментариям в разработке