Durco Mark 3 ASME Chemical Process Pump Maintenance

Описание к видео Durco Mark 3 ASME Chemical Process Pump Maintenance

This video takes the viewer step-by-step through disassembly, inspection, and reassembly of the Flowserve Durco Mark 3 ASME chemical process pump. Sections include:

• Disassembly
• Power End Assembly
• Power End Inspection
• Wet End Assembly
• Impeller Clearance Setting
• Mechanical Seal Installation

Комментарии

Информация по комментариям в разработке