Logo video2dn
  • Сохранить видео с ютуба
  • Категории
    • Музыка
    • Кино и Анимация
    • Автомобили
    • Животные
    • Спорт
    • Путешествия
    • Игры
    • Люди и Блоги
    • Юмор
    • Развлечения
    • Новости и Политика
    • Howto и Стиль
    • Diy своими руками
    • Образование
    • Наука и Технологии
    • Некоммерческие Организации
  • О сайте

Скачать или смотреть Rippa delivery pressure and quality commitment - we choose long-term reliability

  • Rippa Group
  • 2025-09-04
  • 87512
Rippa delivery pressure and quality commitment - we choose long-term reliability
mini excavatorrippa mini excavatorrippa excavatorripparippa r10rippa r13rippa r15rippa r18rippa r22rippa r32rippar319rippa brandRippa IQCIncoming Quality ControlGear Fatigue LifeSupplier QualityCAPAProcess DriftDurability AssuranceManufacturing QualityPurchasing and ProductionLong-Term ReliabilityHeavy Equipment PartsAcceptance CriteriaQuality Gates
  • ok logo

Скачать Rippa delivery pressure and quality commitment - we choose long-term reliability бесплатно в качестве 4к (2к / 1080p)

У нас вы можете скачать бесплатно Rippa delivery pressure and quality commitment - we choose long-term reliability или посмотреть видео с ютуба в максимальном доступном качестве.

Для скачивания выберите вариант из формы ниже:

  • Информация по загрузке:

Cкачать музыку Rippa delivery pressure and quality commitment - we choose long-term reliability бесплатно в формате MP3:

Если иконки загрузки не отобразились, ПОЖАЛУЙСТА, НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если у вас возникли трудности с загрузкой, пожалуйста, свяжитесь с нами по контактам, указанным в нижней части страницы.
Спасибо за использование сервиса video2dn.com

Описание к видео Rippa delivery pressure and quality commitment - we choose long-term reliability

"Production pressure versus quality commitment. IQC fatigue life has decreased by 5%—we're rejecting this batch. Quality starts at the gate."

At the IQC station, the fatigue life of a batch of gears decreased by 5% compared to the previous batch. This was still within tolerance, but fell short of our commitment. Faced with production pressure, Purchasing stood its ground and rejected the batch to prevent long-term durability risks. Quality doesn't start on the production line, it starts at the gate.

You'll see this in about 30 seconds:

Report Close-up: Fatigue life decreased by 5% compared to the previous batch
Planning requested on-schedule delivery; Purchasing refused
Decision: Reject the batch and urge the supplier to take corrective action
Message: "Usable" isn't enough—build for 10 years of durability
Importance:

Small differences can indicate process deviations and future failures
Protect customers from hidden lifecycle costs
Internal coordination: Planning respects quality, not the other way around
Call to Action:

Comment: If the life decreases by 5%, would you deliver or reject the batch? Why?
Subscribe for more real-world quality assurance decisions and supplier improvement stories.
Share with colleagues in Planning, Purchasing, and Quality Control.
Suggested pinned comment:
Tolerances and Trends: Where do you draw the line in incoming inspection? Share your rules and how you handle CAPAs with suppliers.

Rippa IQC, Incoming Quality Control, Gear Fatigue Life, Supplier Quality, CAPA, Process Drift, Durability Assurance, Manufacturing Quality, Purchasing and Production, Long-Term Reliability, Heavy Equipment Parts, Acceptance Criteria, Quality Gates

#Rippa #Quality #IQC #SupplierQuality #Manufacturing #Durability #Reliability #CAPA #ProcessControl #GearTesting #HeavyEquipment #Factory #SitePrep #Video #Rippa #Reliability #Manufacturing

Комментарии

Информация по комментариям в разработке

Похожие видео

  • О нас
  • Контакты
  • Отказ от ответственности - Disclaimer
  • Условия использования сайта - TOS
  • Политика конфиденциальности

video2dn Copyright © 2023 - 2025

Контакты для правообладателей [email protected]