Logo video2dn
  • Сохранить видео с ютуба
  • Категории
    • Музыка
    • Кино и Анимация
    • Автомобили
    • Животные
    • Спорт
    • Путешествия
    • Игры
    • Люди и Блоги
    • Юмор
    • Развлечения
    • Новости и Политика
    • Howto и Стиль
    • Diy своими руками
    • Образование
    • Наука и Технологии
    • Некоммерческие Организации
  • О сайте

Скачать или смотреть KALAYAAN BRIDGE or BGC-Ortigas Bridge Update | Sta. Monica-Lawton Bridge is now Open

  • BOOMING PHILIPPINES
  • 2021-09-10
  • 1398
KALAYAAN BRIDGE or BGC-Ortigas Bridge Update | Sta. Monica-Lawton Bridge is now Open
BGC-Ortigas Bridge President AquinoSanta Monica - Lawson Bridge President AquinoBCG-Ortigas Bridge PinoyBCB-Ortigas Bridge AquinoRoute of BGC-Ortigas BridgeOpening date of BCG-Ortigas BridgeOpening date of Sta. Monica - Lawson BridgePresident Duterte Build Build BuildPresident Duterte ProjectsPresident Aquino ProjectsProject finished by President AquinoProject finished under duterte administrationProjects Under Duterte AdministrationPinoy Projects
  • ok logo

Скачать KALAYAAN BRIDGE or BGC-Ortigas Bridge Update | Sta. Monica-Lawton Bridge is now Open бесплатно в качестве 4к (2к / 1080p)

У нас вы можете скачать бесплатно KALAYAAN BRIDGE or BGC-Ortigas Bridge Update | Sta. Monica-Lawton Bridge is now Open или посмотреть видео с ютуба в максимальном доступном качестве.

Для скачивания выберите вариант из формы ниже:

  • Информация по загрузке:

Cкачать музыку KALAYAAN BRIDGE or BGC-Ortigas Bridge Update | Sta. Monica-Lawton Bridge is now Open бесплатно в формате MP3:

Если иконки загрузки не отобразились, ПОЖАЛУЙСТА, НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если у вас возникли трудности с загрузкой, пожалуйста, свяжитесь с нами по контактам, указанным в нижней части страницы.
Спасибо за использование сервиса video2dn.com

Описание к видео KALAYAAN BRIDGE or BGC-Ortigas Bridge Update | Sta. Monica-Lawton Bridge is now Open

The KALAYAAN BRIDGE or Bonifacio Global City (BGC)-Ortigas Bridge, also known as Santa Monica – Lawton Bridge was opened to serve the motorists last Independence Day, June 12, 2021,

With a project cost of 1.3 Billion Pesos, the BGC–Ortigas Link Bridge, is 440 meter, four-lane, two-way bridge that will connect across Pasig River the Lawton Avenue in Makati City and Sta. Monica Street in Pasig City.

From the usual 1-hour drive, motorists coming from BGC can already reach Ortigas or vice versa in just 12-minutes; and the bridge will be able to accommodate around 50,000 vehicles per day.

The Bridge entrance is at the Kalayaan Avenue and the exit is at Fairlane in Ortigas.

Currently, safety checking is being conducted in order to ensure its built quality and conform with the safety standards, while some finishing touches are also being done.

A state funded project, this mega project was approved by NEDA for implementation last April 23, 2015, under the Aquino administration.

http://www.neda.gov.ph/wp-content/upl...

Pre-construction activities of this project which included the preparation of the detailed engineering design was also started under the Aquino administration; while the Ground breaking and inauguration ceremonies, which signalled the start of the construction, was held last July 19, 2017 under the Duterte administration.

The Sta. Monica-Lawton Bridge or the BGC-Ortigas Bridge is the Phase 1 of the 1.367 kilometer BGC-Ortigas Road Link Project; and is part of the government’s program of decongesting EDA. Major roads like EDSA are expected to decongest more than 10% in volume because of this project.

Also part of the project that will traverse Lawton Avenue to the entrance of BGC is the construction of Lawton Avenue – Global City Viaduct with on-going preparation for bored piling at BGC and road widening at 8th Avenue.

Meanwhile, full blast works for the rehabilitation and widening of Brixton Street (corner Reliance Street) to Fairlane Street with a total length of 476.577 meters, 159.629 meters approach road at abutment 1, and 125 meters up and down ramp between pier 8 to 13.

Upon completion of the entire BGC-Ortigas Road Link project, accessibility between cities of Pasig, Mandaluyong, Taguig and Makati will be improved; while traffic congestion in EDSA and C-5 will be alleviated.

Target completion of the entire Road Link is by September 2021.

#KalayaanBridge #BGCOrtigasBridge #SantaMonicaLawtonBridge

Комментарии

Информация по комментариям в разработке

Похожие видео

  • О нас
  • Контакты
  • Отказ от ответственности - Disclaimer
  • Условия использования сайта - TOS
  • Политика конфиденциальности

video2dn Copyright © 2023 - 2025

Контакты для правообладателей [email protected]