200hp Electric Fire Pump Testing with VIZI touch controller

Описание к видео 200hp Electric Fire Pump Testing with VIZI touch controller

Electric Fire Pump Testing
200hp
2000gpm
117psi

Monthly fire testing is required in NFPA 25 a no flow test. Whereas in this case we consider to open the main bypass valve since the pump creating a high bearing temperature even the circulation relief valve is opened.

Opening bypass valve in 1/4 position of the gate valve is not accepted since the bypass riser pipe has not enough vibration support which vibrate so much.

*The electric fire pump should run a minimum of 10 minutes.

*The diesel pump should run a minimum of 30 minutes.

Комментарии

Информация по комментариям в разработке