Full steel binding wind turbine foundation | 2.7 MW wind turbine Steel binding
A complete wind turbine steelwork process involves several steps, ranging from designing, fabricating, and assembling steel components to erecting the turbine structure. Here's a detailed A-to-Z description of the work for 32 metric tons of steel:
1. Design and Engineering
Structural Design: Create detailed engineering drawings, considering loads (wind, seismic, etc.) and compliance with standards.
Material Selection: Choose appropriate grades of steel (e.g., S355, S275) to ensure durability and strength.
Finite Element Analysis (FEA): Perform structural analysis to validate designs.
2. Material Procurement
Procure high-quality raw steel plates, beams, and tubular sections per design specifications.
Ensure material certifications for strength, weldability, and corrosion resistance.
3. Cutting and Shaping
CNC Cutting: Use plasma or laser cutting machines to cut steel plates.
Rolling and Bending: Roll steel plates into cylindrical/tapered sections for the tower and form curved components as required.
Drilling and Punching: Create holes for bolts, flanges, and other fasteners using automated tools.
4. Welding
Types of Welding: Apply Submerged Arc Welding (SAW), MIG/MAG, or TIG welding depending on the application.
Weld Quality Assurance: Perform Non-Destructive Testing (NDT) methods like ultrasonic testing, X-ray inspection, and dye penetrant tests.
5. Surface Preparation
Sandblasting: Clean surfaces to remove rust, scale, and contaminants.
Coating: Apply anti-corrosion coatings, such as epoxy primers and polyurethane topcoats.
6. Fabrication of Components
Tower Sections:
Weld cylindrical steel sections together, integrating internal flanges for bolted connections.
Attach ladders, platforms, and cable trays.
Nacelle Frame:
Fabricate steel frames to house the generator, gearbox, and other equipment.
Base Anchor System:
Produce steel base plates and anchor bolts for foundation connections.
Hub and Rotors:
Construct steel hubs for rotor blades' attachment.
7. Assembly and Pre-Erection Checks
Trial Assembly: Assemble components in the factory to verify fit and alignment.
Dimensional Inspection: Check dimensions against specifications.
Load Testing: Test the strength of welded joints and flanges under simulated loads.
8. Transportation
Logistics Planning: Plan the transport of large steel components to the site.
Use specialized trailers for oversized loads.
9. On-Site Erection
Foundation Preparation: Ensure the foundation is ready, with anchor bolts aligned.
Crane Lifting: Use heavy cranes to lift and assemble tower sections, nacelle, and rotor blades.
Bolting: Secure connections using high-tension bolts and torque checks.
10. Final Coating and Protection
Apply final touch-ups to coatings to address damage during transport or erection.
Add corrosion protection measures like cathodic protection if necessary.
11. Inspection and Testing
Perform visual inspections for alignment, weld quality, and coating integrity.
Conduct load tests and vibration analyses on the assembled turbine.
12. Commissioning and Handover
Conduct a thorough commissioning process, including load trials and functionality checks.
Hand over the wind turbine to the client with detailed documentation.
This process ensures the turbine steelwork meets quality, safety, and operational standards. For 32 metric tons of steel, the scale would likely involve a medium-sized wind turbine, where precision and compliance with international standards like IEC 61400 are critical.
full Steel binding interval foundation in all work is completed a to z wind turbine Foundation A2Z Steel binding on PCC anchor KJ symbol all still work and N2 on total still work in 3 days 25 labour in 8 hours total still 32 metric ton
#construction
#contentcreator
#windturbine
#steel
#civil_work
#steelindustry
#civil_engineer_jobs
#civilengineering
#civilengineer
#civil
#concrete
#pcc
#working
#greenenergy
#electricity
#labour
#shorts
#help
#subscribe
#labour
#my
#life
#first
#farstvlog
#construction
#concrete
#concrete_mixture_machine
#contentcreator
#civil_work
#dubai
thanks for watching this video 😊
Информация по комментариям в разработке