Logo video2dn
  • Сохранить видео с ютуба
  • Категории
    • Музыка
    • Кино и Анимация
    • Автомобили
    • Животные
    • Спорт
    • Путешествия
    • Игры
    • Люди и Блоги
    • Юмор
    • Развлечения
    • Новости и Политика
    • Howto и Стиль
    • Diy своими руками
    • Образование
    • Наука и Технологии
    • Некоммерческие Организации
  • О сайте

Скачать или смотреть Rajendra Pul (Mokama - Simaria Bridge) Full Crossing । New Rajendra Setu Construction View

  • H. Ankit
  • 2023-04-30
  • 7292
Rajendra Pul (Mokama - Simaria Bridge) Full Crossing । New Rajendra Setu Construction View
Rajendra Nagar TerminalSaharsa JunctionSaharsa Railway StationRajendra Nagar Saharsa Intercity ExpressSaharsa se Patna ke liye trainSimaria pulSimaria bridgeRajendra Pul simariyaRajendra setuSimaria ghat ka pulRajendra Pul biharRajendra Pul mobile chorRajendra Pul ka videoRajendra setu New bridgeRajendra setu BridgeMokama Bridge BiharMokama Bridge updateMokama pul updateRajendra Pul HatidahHatidah new bridgeRajendra Pul Station13228
  • ok logo

Скачать Rajendra Pul (Mokama - Simaria Bridge) Full Crossing । New Rajendra Setu Construction View бесплатно в качестве 4к (2к / 1080p)

У нас вы можете скачать бесплатно Rajendra Pul (Mokama - Simaria Bridge) Full Crossing । New Rajendra Setu Construction View или посмотреть видео с ютуба в максимальном доступном качестве.

Для скачивания выберите вариант из формы ниже:

  • Информация по загрузке:

Cкачать музыку Rajendra Pul (Mokama - Simaria Bridge) Full Crossing । New Rajendra Setu Construction View бесплатно в формате MP3:

Если иконки загрузки не отобразились, ПОЖАЛУЙСТА, НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если у вас возникли трудности с загрузкой, пожалуйста, свяжитесь с нами по контактам, указанным в нижней части страницы.
Спасибо за использование сервиса video2dn.com

Описание к видео Rajendra Pul (Mokama - Simaria Bridge) Full Crossing । New Rajendra Setu Construction View

Rajendra Pul (Mokama - Simaria Bridge) Full Crossing । New Rajendra Setu Construction View
राजेंद्र पुल (मोकामा - सिमरिया पुल) को पार करती राजेंद्र नगर - सहरसा इंटरसिटी एक्सप्रेस । नए राजेंद्र सेतु के निर्माण कार्य की झलक



__________________________________________________


For More Similar Videos, Check out the links below -

Bridges And Tunnels:    • Bridges And Tunnels  

High Speed Trains:    • High Speed Trains  

Intercity Express:    • Intercity Express  

Latest News / Updates:    • Latest News / Updates  


__________________________________________________


Like And Share The Video With Your Family And Friends.
Subscribe My YouTube Channels -
   / vikramshilaexpress  
   / @vikramshilaexpress2368  

Follow Me On
Twitter -   / hankit_rf  
Instagram -   / ankit.findx  


__________________________________________________


About Rajendra Setu--

Rajendra Setu, or Simaria Bridge, is a bridge across the Ganges that was the first to link the northern and southern portions of the state of Bihar. The location of the bridge was based on the work of M. Visvesvaraya, who was more than 90 years old at the time. In a wheelchair, he visited the bridge site on the special request of Bihar's chief minister, Shri Krishna Sinha. It was the first bridge over the Ganges to be built in independent India (after 1947).

The road-cum-rail bridge near Hathidah in Patna district and Simaria in Begusarai district was inaugurated in 1959 by Jawaharlal Nehru, prime minister of India, and Shri Krishna Sinha. The bridge was constructed by Braithwaite, Burn & Jessop Construction Company. It is about 2 kilometres (1.2 mi) long and carries a two-lane road and a single-line railway track.

A new bridge, carrying the four-lane NH 31 and double-track rail, 25 metres upstream from the existing rail and road bridge, was planned in 2011.

The construction of the new parallel double-line railway bridge was inaugurated by prime minister Narendra Modi on 12 March 2016.The new 1.9 km railway bridge was supposed to be operational by February 2021, but is now expected to be operational by 2024. The contract for construction of the new bridge was awarded to M/s AFCONS Infrastructure Ltd by the Indian Railway Construction Company Limited (IRCON) on an EPC contract basis. Construction has also started on a new six-lane road bridge, which has a span of 34 metres, parallel to it, which is supposed to become operational by December 2023.



__________________________________________________


About Rajendra Nagar Saharsa Intercity Express--

Rajendra Nagar Saharsa Express is an Express train belonging to East Central Railway Zone that runs between Rajendra Nagar Terminal (Patna) and Saharsa in Bihar, India. It runs with train numbers 13227/13228 on a daily basis.

13227 Saharsa Rajendra Nagar Intercity Express has an average speed of 33 km/hr & covers 214 km in 6h 35m.
132288 Rajendra Nagar Saharsa Intercity Express has an average speed of 34 km/hr & covers 214 km in 6h 15m.

Both trains are hauled by a HOG Enabled WAP 7 of Gomoh Electric Locomotive Shed.

The Coach Composition Of Saharsa Intercity Express Is As Follows-
1 AC Chair Car
17 General Coaches
1 Generator Car
1 LHB SLR Coach

13227/13228 Saharsa Rajendra Nagar Saharsa Intercity Express Halts At The Following Stations -
Saharsa Junction
Simri Bakhtiyarpur
Koparia
Badla Ghat
Mansi Junction
Khagaria Junction
Sahibpur Kamal Junction
Begusarai
Barauni Junction
Mokama
Barh
Bakhtiyarpur Junction
Fatuha Junction
Patna Saheb
Rajendra Nagar Terminal


__________________________________________________

#rajendrapul #simaria #mokama #barauni #gangariver #gangapul #gangabridge #hatidah #saharsa #intercityexpress #patna #rajendranagar #सहरसा #पटना #इंटरसिटीएक्सप्रेस #saharsarailwaystation #saharsajunction #patnajunction #intercity #newbridge

Комментарии

Информация по комментариям в разработке

Похожие видео

  • О нас
  • Контакты
  • Отказ от ответственности - Disclaimer
  • Условия использования сайта - TOS
  • Политика конфиденциальности

video2dn Copyright © 2023 - 2025

Контакты для правообладателей [email protected]