SETTING OUT on decking. TOTAL STATION set up using mono leg. Checks before concrete.

Описание к видео SETTING OUT on decking. TOTAL STATION set up using mono leg. Checks before concrete.

In today's video I will show you how to do setting out on the decking and how to set up your total station before the first slab pour on the next level. I will also show you the drawings from where we'll take the key information to get the job done right. This is the second video out of 4 covering the typical suspended slab in residential project. Please subscribe to the channel and follow @SITENG on LinkedIn.
LinkedIn:   / siteng  
Ko-fi: https://ko-fi.com/siteng
#CivilEngineer#Construction#SettingOut

Комментарии

Информация по комментариям в разработке