Скачать или смотреть B2B Energy Toolbox Tip No 4 Hand Off Auto Switch - www.b2benergy.co.uk and www.aumlink.com

  • B2B Energy
  • 2022-05-29
  • 31
B2B Energy Toolbox Tip No 4   Hand Off Auto Switch - www.b2benergy.co.uk and www.aumlink.com
energydata3rd largest expensemeter readingsenergy managementtoolbox tipsreducing energyconsumptionelectrictygaswatersavingsclimate changesustainabilityenergy graphshow to managemonthly billingcontrol panelsBMSBuilding Management SystemsB2B EnergyEnergy Helpenergy savingswasted energyoverride
  • ok logo

Скачать B2B Energy Toolbox Tip No 4 Hand Off Auto Switch - www.b2benergy.co.uk and www.aumlink.com бесплатно в качестве 4к (2к / 1080p)

У нас вы можете скачать бесплатно B2B Energy Toolbox Tip No 4 Hand Off Auto Switch - www.b2benergy.co.uk and www.aumlink.com или посмотреть видео с ютуба в максимальном доступном качестве.

Для скачивания выберите вариант из формы ниже:

  • Информация по загрузке:

Cкачать музыку B2B Energy Toolbox Tip No 4 Hand Off Auto Switch - www.b2benergy.co.uk and www.aumlink.com бесплатно в формате MP3:

Если иконки загрузки не отобразились, ПОЖАЛУЙСТА, НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если у вас возникли трудности с загрузкой, пожалуйста, свяжитесь с нами по контактам, указанным в нижней части страницы.
Спасибо за использование сервиса video2dn.com

Описание к видео B2B Energy Toolbox Tip No 4 Hand Off Auto Switch - www.b2benergy.co.uk and www.aumlink.com

When Carrying out Energy Assessments, I will always ensure I put some of my attention into the Motor Control Centre (MCC). This is where most of the plant for the heating, ventilation and cooling will be controlled from. You need to be mindful that there could be more than one MCC panel within the building.

The first thing I do when I see an MCC Panel within the plant room is to scan the control switches twice. The first time, checking to see if all switches are facing the same way, (this is good practice amongst control panel manufacturers to maintain convention and ensure there is a standard way of indicating). My second scan reviews the switches that are not facing the same way. This tells me if there are any control issues to record.

• This means that this pump will be running 24hours a day and not running as programmed to run.

• This, therefore is costing money.

• This could be increasing the buildings kWh consumption by 15 – 20%.

Whilst carrying out the Assessment:

1. View the MCC panel, scan the switches and identify which switches are in ‘Hand’. You would expect them all to be in ‘Auto’.
2. Take a picture for evidence. I have seen the client quickly put them back into ‘Auto’. We are not trying to catch anyone out, but to understand how to improve the efficiency of the property.
3. Train staff while you are in front of the MCC and advise them to either do this daily or weekly to ensure the plant is not being tampered with.
4. Identify the plant this is controlling, and try to calculate the kWh for this equipment to be in hand.
Why could the switch be placed in ‘Hand’?
The are many reasons why these switches could be put into ‘Hand’:

1. The maintenance team have put the plant into ‘Hand’ and forgotten to put back.
2. Control Issues with the Building Management System (BMS) and the plant is put into hand or it will not run.
3. The BMS is faulty.
4. The BMS time zones are incorrect.
5. The BMS time clock is incorrect, and the time zones are not working correctly.
6. Someone wanted to put this ‘on’ out of hours, for a function or for an event, but they haven’t put it back.

What to do if the control switch is in ‘Hand’

If the control switch is in ‘Hand’ these are the actions to take:

· Report to the maintenance manager who may be with you.
· With the permission of the maintenance team, switch the control switch to Auto.
1. If the plant stays running, check the time-zones and monitor.
2. If the plant does not work, possibly call a BMS specialist to review the control system.

#energy #control #b2benergyexperts

Prepared by Paul Webb for Energy Experts around the world

Thank you to our sponsers:

www.hark.com

Комментарии

Информация по комментариям в разработке

Похожие видео

  • О нас
  • Контакты
  • Отказ от ответственности - Disclaimer
  • Условия использования сайта - TOS
  • Политика конфиденциальности

video2dn Copyright © 2023 - 2025

Контакты для правообладателей [email protected]