Logo video2dn
  • Сохранить видео с ютуба
  • Категории
    • Музыка
    • Кино и Анимация
    • Автомобили
    • Животные
    • Спорт
    • Путешествия
    • Игры
    • Люди и Блоги
    • Юмор
    • Развлечения
    • Новости и Политика
    • Howto и Стиль
    • Diy своими руками
    • Образование
    • Наука и Технологии
    • Некоммерческие Организации
  • О сайте

Скачать или смотреть The Proposed Fourth Mainland Bridge (4MB) In Lagos Nigeria // 3-D Animation

  • Iamgbolahan
  • 2022-12-30
  • 4496
The Proposed Fourth Mainland Bridge (4MB) In Lagos Nigeria // 3-D Animation
Fourth mainland Bridge4th mainland bridgeLagos bridge projectDevelopment in Lagos Nigeriaproposed 4th mainland bridge4mb projectLagos blue line railLagos rail metro
  • ok logo

Скачать The Proposed Fourth Mainland Bridge (4MB) In Lagos Nigeria // 3-D Animation бесплатно в качестве 4к (2к / 1080p)

У нас вы можете скачать бесплатно The Proposed Fourth Mainland Bridge (4MB) In Lagos Nigeria // 3-D Animation или посмотреть видео с ютуба в максимальном доступном качестве.

Для скачивания выберите вариант из формы ниже:

  • Информация по загрузке:

Cкачать музыку The Proposed Fourth Mainland Bridge (4MB) In Lagos Nigeria // 3-D Animation бесплатно в формате MP3:

Если иконки загрузки не отобразились, ПОЖАЛУЙСТА, НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если у вас возникли трудности с загрузкой, пожалуйста, свяжитесь с нами по контактам, указанным в нижней части страницы.
Спасибо за использование сервиса video2dn.com

Описание к видео The Proposed Fourth Mainland Bridge (4MB) In Lagos Nigeria // 3-D Animation

Today, history was made yet again, as we officially announced the preferred bidders for the proposed 4th mainland bridge (4MB) project.

This project which is a PPP arrangement between Lagos state through the office of the PPP and the private sector investors went through a rigorous process before the emergence of CCECC-CRCCIG CONSORTIUM as the preferred bidder and MOTA-ENGIL (NIGERIA &AFRICA), CCCC & CRBC CONSORTIUM as the reserved bidder.

The Bridge is expected to become the second longest in Africa, featuring 3 toll plazas, 9 interchanges, a 4.5km Lagoon Bridge and an eco-friendly environment. It is expected to span about 37kilometres, starting from Abraham Adesanya in Ajah, on the Eti-Osa-Lekki-Epe corridor and traverse the North West towards the Lagoon shoreline of the Lagos-Ibadan Expressway via Owutu/Isawo in Ikorodu.

The emergence of the 4MB will relieve severe congestion on the existing Carter, Eko and Third Mainland Bridges, while opening new areas of the City for future developments.

Комментарии

Информация по комментариям в разработке

Похожие видео

  • О нас
  • Контакты
  • Отказ от ответственности - Disclaimer
  • Условия использования сайта - TOS
  • Политика конфиденциальности

video2dn Copyright © 2023 - 2025

Контакты для правообладателей [email protected]