Logo video2dn
  • Сохранить видео с ютуба
  • Категории
    • Музыка
    • Кино и Анимация
    • Автомобили
    • Животные
    • Спорт
    • Путешествия
    • Игры
    • Люди и Блоги
    • Юмор
    • Развлечения
    • Новости и Политика
    • Howto и Стиль
    • Diy своими руками
    • Образование
    • Наука и Технологии
    • Некоммерческие Организации
  • О сайте

Скачать или смотреть India’s FIRST Bullet Train After 75 Years — Why Mumbai–Ahmedabad?

  • NextEra Railways
  • 2026-01-14
  • 215
India’s FIRST Bullet Train After 75 Years — Why Mumbai–Ahmedabad?
bullet train project in indiabullet train in indiabullet train projectbrad pittbullet trainbullet train thrillerBulletTrainIndiaBulletTrainMumbaiAhmedabadMumbaiAhmedabadBulletTrainMAHSRIndianBulletTrainHighSpeedRailHighSpeedRailIndiaIndiaHSRIndianRailwayProjectsRailwayInfrastructureRailwayEngineeringRailwayProjectsIndiaInfrastructureIndiaMegaProjectsIndiaTransportInfrastructurePublicInfrastructureSustainableTransportShinkansenIndiaJapaneseTechnology
  • ok logo

Скачать India’s FIRST Bullet Train After 75 Years — Why Mumbai–Ahmedabad? бесплатно в качестве 4к (2к / 1080p)

У нас вы можете скачать бесплатно India’s FIRST Bullet Train After 75 Years — Why Mumbai–Ahmedabad? или посмотреть видео с ютуба в максимальном доступном качестве.

Для скачивания выберите вариант из формы ниже:

  • Информация по загрузке:

Cкачать музыку India’s FIRST Bullet Train After 75 Years — Why Mumbai–Ahmedabad? бесплатно в формате MP3:

Если иконки загрузки не отобразились, ПОЖАЛУЙСТА, НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если у вас возникли трудности с загрузкой, пожалуйста, свяжитесь с нами по контактам, указанным в нижней части страницы.
Спасибо за использование сервиса video2dn.com

Описание к видео India’s FIRST Bullet Train After 75 Years — Why Mumbai–Ahmedabad?

🇮🇳 India’s FIRST Bullet Train After 75 Years — Why Mumbai–Ahmedabad?

India’s high-speed rail dream is finally taking shape. But why did it take 75 years after Independence to begin construction — and why was Mumbai–Ahmedabad chosen as India’s first Bullet Train corridor over every other major route?

In this data-driven explainer, we cut through the hype and analyse the Mumbai–Ahmedabad High-Speed Rail (MAHSR) project using verified 2026 analytics, official engineering data, and on-ground progress.

🔍 What this video explains:

Project fundamentals: 508.18 km route, 320 km/h operating speed, 12 stations

The strategic “why”: Connecting India’s financial capital with its industrial, textile, and diamond hub

Travel revolution: Journey time reduced from ~6.5 hours to ~2 hours — faster than air travel door-to-door

The cost reality: Why the budget increased from ₹1.08 lakh crore to ~₹1.98 lakh crore

Engineering scale: India’s first 7 km undersea tunnel and 13.1 m diameter TBM operations

Project hurdles: Land acquisition delays in Maharashtra vs. faster execution in Gujarat

Who’s building it: L&T, Afcons, IRCON, Japanese Shinkansen technology partners

2026 status update: On-ground progress and the realistic timeline for phased operations starting near Surat–Bilimora

🚄 Key takeaway

The Mumbai–Ahmedabad Bullet Train is more than a transport project.
It is India’s national test case for high-speed rail — and its outcome will shape the future of the proposed Diamond Quadrilateral and all upcoming HSR corridors.

💬 Join the conversation

Is a ₹1.98 lakh crore investment justified for a 2-hour intercity journey?
Share your views in the comments.

🔔 Subscribe to NextEra Railways for more data-driven deep dives into India’s railway and infrastructure evolution.

▶️ Watch next: 200 Years of Indian Railways — 1853 to 2050

Комментарии

Информация по комментариям в разработке

Похожие видео

  • О нас
  • Контакты
  • Отказ от ответственности - Disclaimer
  • Условия использования сайта - TOS
  • Политика конфиденциальности

video2dn Copyright © 2023 - 2025

Контакты для правообладателей [email protected]