Battery Installation Steps 4 to 7

Описание к видео Battery Installation Steps 4 to 7

Step 4: Connect the main -ve out from the Batteries to the BMS
Step 5: Connect Monitoring Cables
Step 6: Main Power Cables out of cabinet from Batteries and from BMS
Step 7: Powering on the BMS

This episode will run through connecting the Battery negative to the BMS, connecting the Cell monitoring cables to the BMS, connecting the cables that will exit the battery pack, and be connected the rest of the system (the inverter) and connecting the cable which powers the BMS. It covers Steps 4, 5, 6, and 7 of the Installation Manual.

Комментарии

Информация по комментариям в разработке