Birmingham HS2 all areas covered 24

Описание к видео Birmingham HS2 all areas covered 24

HS2 in Birmingham
Sitting at the heart of the high-speed rail network, HS2 connects Birmingham City Centre to London and the rest of the network from the new Curzon Street Station, which will be one of the most environmentally friendly stations in the world.
The route leaves the station on viaducts through the city to Washwood Heath. This is where the new rolling stock maintenance depot and the network control centre will be built.
The HS2 railway then moves into a tunnel emerging east of the A452, before heading south at Castle Vale towards London. Within Birmingham, we will be building one tunnel at Bromford, two viaducts at Saltley and the River Tame, and a major depot at Washwood Heath. Three more viaducts through Digbeth and the new HS2 Curzon Street Station will also be constructed.

Royalty Free Music: Bensound.com/royalty-free-music
License code: 5JL8IFKBCEAGPIIN

Комментарии

Информация по комментариям в разработке