Kelly Bored Piles Installation

Описание к видео Kelly Bored Piles Installation

Rotary piling is especially suited to boring through hard strata, and any boulders or man-made obstructions which may prevent the use of CFA piling methods.

Bored piles are extremely suited for transferring high concentrated foundation loads to the subsoil. The excavation of the piles is done using a large drill driven by a heavy drill motor. The stability of the bore hole is upheld by placing steel casings, which are driven into the soil using the telescopic Kelly bar. When casting concrete around the pile, the steel casings are recovered.

For more information about Aarsleff Ground Engineering or to send in your enquiry, call 01636 611140 or visit www.aarsleff.co.uk

Комментарии

Информация по комментариям в разработке